John A. Champie
- Based in
- Woodacre
- On San Francisco permits
- Apr 2005 to Jun 2018
- Last 24 months
- 0 permits filed
8 permits since 2000: 2 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 22 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 4, 2007 | Completed final sign-off Apr 2007 | 1056 Sanchez St | replace stair treads 10 minor dryrot repair. paint entry stairs. replace 3 2x4/ [prtopm stair house. no deck. repair sheet rock below stairs. add 4 vents under stairs. repair in kind for maintanance repair only. substantial replacement repair may require plan submittal per inspectors discriptionDetails
replace stair treads 10 minor dryrot repair. paint entry stairs. replace 3 2x4/ [prtopm stair house. no deck. repair sheet rock below stairs. add 4 vents under stairs. repair in kind for maintanance repair only. substantial replacement repair may require plan submittal per inspectors discription | $2,500 |