Back to bathroom remodel contractors
Joey Builders Inc
- Based in
- Long Beach
- On San Francisco permits
- Mar 2023 to Jun 2026
- Last 24 months
- 5 permits filed
11 permits since 2000: 6 completed, 4 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 1 completed, 4 in progress, 1 never finaled. Typically 0 days from filing to permit and 55 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | In progress issued Jun 2026 | 68 Josiah Av | like for like bathroom remodel, replace toilet, vanity, tub, and fan. updrade mep. no change to floor layout. no change to wall layout. no structural work.Details
like for like bathroom remodel, replace toilet, vanity, tub, and fan. updrade mep. no change to floor layout. no change to wall layout. no structural work. | $20,000 |
| Apr 24, 2026 | In progress issued Apr 2026 | 201 Harrison St | unit 215: like for like bathroom remodel, tubb to tub, replace toilet, vanity, sink, fan. no structual changes.Details
unit 215: like for like bathroom remodel, tubb to tub, replace toilet, vanity, sink, fan. no structual changes. | $30,000 |
| Mar 5, 2025 | In progress issued Mar 2025 | 1846 10th Av | one bathroom remodel like for like, shower pan 140 sq ft. no moving walls. no layout changes.Details
one bathroom remodel like for like, shower pan 140 sq ft. no moving walls. no layout changes. | $25,000 |
| Nov 6, 2024 | In progress issued Nov 2024 | 367 Christopher Dr | bathroom remodel like for likeDetails
bathroom remodel like for like | $20,000 |
| Aug 30, 2024 | Completed final sign-off Oct 2024 | 356 Marietta Dr | bathroom remodel like for likeDetails
bathroom remodel like for like | $15,000 |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 1615 Quesada Av | remodel 1 bathroom, replace bathroom window not visible from street, replace subfloor due to water damage on den area approx 275 sq ft, replace 775 sq ft of drywall (5/8) sheetrock including the garage side. all work done in kind.Details
remodel 1 bathroom, replace bathroom window not visible from street, replace subfloor due to water damage on den area approx 275 sq ft, replace 775 sq ft of drywall (5/8) sheetrock including the garage side. all work done in kind. | $29,500 |