Back to bathroom remodel contractors
Joe Doerr Construction
- Based in
- Mill Valley
- On San Francisco permits
- Jul 2007 to Nov 2023
- Last 24 months
- 0 permits filed
16 permits since 2000: 12 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 3 completed, 1 never finaled, 2 expired or cancelled. Typically 2 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2014 | Never finaled issued Aug 2014, no final | 2140 Scott St | interior renovation of bathroom, kitchen & living room in 1095 s.f. residential condo unit. work includes demolition, minor structural work, new doorway to kitchen, casework, kitchen appliances, plumbing fixtures & relocation/replacement of (e) light fixtures.Details
interior renovation of bathroom, kitchen & living room in 1095 s.f. residential condo unit. work includes demolition, minor structural work, new doorway to kitchen, casework, kitchen appliances, plumbing fixtures & relocation/replacement of (e) light fixtures. | $20,000 |
| Jul 9, 2014 | Completed final sign-off Jul 2016 | 771 11th Av | bay window in dining room and bedroom alteration, new bath in e study adjacent to master bedroom, new deck, replacement of all windows and doors on west side of houseDetails
bay window in dining room and bedroom alteration, new bath in e study adjacent to master bedroom, new deck, replacement of all windows and doors on west side of house | $77,000 |
| Feb 5, 2013 | Expired or cancelled expired Apr 2017 | 56 Lucy St | remodel kitchen and bath in kind. remove all hard wood floor and finishes remove 800 sq ft dry wall for investigated structural work that will be under seperate permit.Details
remodel kitchen and bath in kind. remove all hard wood floor and finishes remove 800 sq ft dry wall for investigated structural work that will be under seperate permit. | $20,000 |
| Aug 22, 2012 | Expired or cancelled expired Sep 2015 | 365 Castenada Av | convert (e) unfinished garage level to finish playroom plus bathroom. replace four damaged windows w/new wood clad to match existing. change window to door.no work on the other floor.Details
convert (e) unfinished garage level to finish playroom plus bathroom. replace four damaged windows w/new wood clad to match existing. change window to door.no work on the other floor. | $65,000 |
| May 18, 2011 | Completed final sign-off Oct 2011 | 365 Castenada Av | 9n) fixtures & finishes in kitche; upgrade basement stair, (n) fixtures & finishes in mstr. bath; relocate laundry machines, (n) structure in basement & garage to support 1st. flr.Details
9n) fixtures & finishes in kitche; upgrade basement stair, (n) fixtures & finishes in mstr. bath; relocate laundry machines, (n) structure in basement & garage to support 1st. flr. | $150,000 |
| Oct 6, 2010 | Completed final sign-off May 2011 | 67 Carmel St | interior finishes, add full bath room, replace stair at 2nd floor incl. exterior walls with new stairs, add a bathroom at 2nd fl. window replacement at 2nd floorDetails
interior finishes, add full bath room, replace stair at 2nd floor incl. exterior walls with new stairs, add a bathroom at 2nd fl. window replacement at 2nd floor | $75,000 |