Back to bathroom remodel contractors
Jmo Construction And Electric
- Based in
- Los Banos
- On San Francisco permits
- Oct 2023 to Aug 2026
- Last 24 months
- 4 permits filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 in progress. Typically 0 days from filing to permit and 49 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Aug 2026 | 3959 19th St | bathroom remodel: frame out (e) wall to accommodate tub, tub drian, new hot and cold lines for shower valve, new water proof and shower walls, new tiles, add new 2 x4 wood, new 120v circuit for bathroom, add lights and swicthes. no change in layout and no conversions.Details
bathroom remodel: frame out (e) wall to accommodate tub, tub drian, new hot and cold lines for shower valve, new water proof and shower walls, new tiles, add new 2 x4 wood, new 120v circuit for bathroom, add lights and swicthes. no change in layout and no conversions. | $32,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 1438 Green St | 1st bathroom: in kind bathroom remodel shower surround, remove tile at tub area. replace bathtub, prep shower surrounding walls with denshield. install tile around tub area and floor. new shower valve. new elec. 2nd bathroom: in kind remodel new shower pan new drain, new shower valve, waterproofDetails
1st bathroom: in kind bathroom remodel shower surround, remove tile at tub area. replace bathtub, prep shower surrounding walls with denshield. install tile around tub area and floor. new shower valve. new elec. 2nd bathroom: in kind remodel new shower pan new drain, new shower valve, waterproof | $44,000 |
| May 22, 2026 | Completed final sign-off Jul 2026 | 136 Beulah St | unit 2 in-kind bathroom remodel l- shower surrondings, remove tiles around tub area, remove bathtub. prep shower surrounding wall within waterproofing panels install new tile 7x7 fl. install new bathtub, new shower valve, new toilet, new sinkDetails
unit 2 in-kind bathroom remodel l- shower surrondings, remove tiles around tub area, remove bathtub. prep shower surrounding wall within waterproofing panels install new tile 7x7 fl. install new bathtub, new shower valve, new toilet, new sink | $14,200 |