Jk Flanagan
- Based in
- San Francisco
- On San Francisco permits
- Dec 2015 to Dec 2015
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2015 | Completed final sign-off Jul 2016 | 518 17th Av | at rear yard, repair exisitng area at 3rd story, with water damage. replace exisitng damaged framing, install new wood siding, new roofing & replace three existing windows. upgrade existing structural support at ground level.Details
at rear yard, repair exisitng area at 3rd story, with water damage. replace exisitng damaged framing, install new wood siding, new roofing & replace three existing windows. upgrade existing structural support at ground level. | $18,000 |