Back to bathroom remodel contractors
Jj Heating And Air Conditioning Co
- Based in
- Pleasanton
- On San Francisco permits
- Aug 2022 to Aug 2022
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 expired or cancelled. Typically 17 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2022 | Expired or cancelled expired May 2026 | 144 Lexington St | installation of 3 new cental gas furnaces and air conditioners, one system per floor. installation of new bathroom exhaust fans per residence, 5 in total. installation of 3 new kitchen exhaust hoods with venting. ref app#202203079382Details
installation of 3 new cental gas furnaces and air conditioners, one system per floor. installation of new bathroom exhaust fans per residence, 5 in total. installation of 3 new kitchen exhaust hoods with venting. ref app#202203079382 | $25,000 |