Back to bathroom remodel contractors
Jj Construction & Design Inc.
- Based in
- Oakland
- On San Francisco permits
- Jan 2014 to Apr 2023
- Last 24 months
- 0 permits filed
8 permits since 2000: 4 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 never finaled. Typically 439 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2022 | Completed final sign-off Dec 2022 | 350 Princeton St | construct 2 bedrooms, 1 full bath, & media room at g/f.Details
construct 2 bedrooms, 1 full bath, & media room at g/f. | $83,000 |
| Jun 18, 2021 | Never finaled issued Aug 2022, no final | 2814 Clay St | unit legalization. interior remodel to convert (e) 966 sf, 1 bedroom 1 bath "unauthorized dwelling unit" into (n) residential unit (legal nonconforming third unit). lower the (e) concrete slab and add site steps in hallway to accommodate code compliant head height. ordinance 43-14Details
unit legalization. interior remodel to convert (e) 966 sf, 1 bedroom 1 bath "unauthorized dwelling unit" into (n) residential unit (legal nonconforming third unit). lower the (e) concrete slab and add site steps in hallway to accommodate code compliant head height. ordinance 43-14 | $50,000 |
| Feb 3, 2020 | Never finaled issued Jul 2022, no final | 2814 Clay St | rear yard expansion, remove unit 2 stairs and relocate. add remodel kitchen and add master bath and 3rd flr roof deck.Details
rear yard expansion, remove unit 2 stairs and relocate. add remodel kitchen and add master bath and 3rd flr roof deck. | $500,000 |