Jimenez Drywall Corporation

Contractor license
842297
State license record
Based in
South Gate
On San Francisco permits
Jul 2017 to Jul 2019
Last 24 months
0 permits filed

5 permits since 2000: 3 completed, 2 never finaled.

Of the 2 never-finaled permits, 2 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Jul 17, 2019Never finaled
issued Aug 2019, no final
1 Grant Avrevision to 201903225990. remove mezzanine bar equipment from original scope of work. bar equipment will be under future permit.
Details
Permit
201907176174
Status
issued
Filed
Jul 17, 2019
Permit issued
Aug 6, 2019
Address
1 Grant Av

revision to 201903225990. remove mezzanine bar equipment from original scope of work. bar equipment will be under future permit.

Open the permit page

Mar 22, 2019Never finaled
issued Mar 2019, no final
1 Grant Avnew back bar & cafe at level 1 and beverage bar with island back bar and shelving at mezzanine. mep under separate permit to pa2019 0319 5615 (e) hvac & lighting system to remain.
Details
Permit
201903225990
Status
issued
Filed
Mar 22, 2019
Permit issued
Mar 29, 2019
Declared cost
$60,000
Address
1 Grant Av

new back bar & cafe at level 1 and beverage bar with island back bar and shelving at mezzanine. mep under separate permit to pa2019 0319 5615 (e) hvac & lighting system to remain.

Open the permit page

$60,000
Aug 18, 2017Completed
final sign-off Aug 2017
1 Grant Avadministrative permit on pa# 201707101441 no mechanical work , electrical work under e201708016703 & e201708157041
Details
Permit
201708185300
Status
complete
Filed
Aug 18, 2017
Permit issued
Aug 18, 2017
Final sign-off
Aug 23, 2017
Address
1 Grant Av

administrative permit on pa# 201707101441 no mechanical work , electrical work under e201708016703 & e201708157041

Open the permit page

Jul 11, 2017Completed
final sign-off Aug 2017
1 Grant Avrevision to pa 2017-0621-9963 removal of 5'-0" wode section of structural concrete wall at basement level as indicated by keynote 8 on drawing 1/d2.00
Details
Permit
201707111504
Status
complete
Filed
Jul 11, 2017
Permit issued
Jul 26, 2017
Final sign-off
Aug 23, 2017
Address
1 Grant Av

revision to pa 2017-0621-9963 removal of 5'-0" wode section of structural concrete wall at basement level as indicated by keynote 8 on drawing 1/d2.00

Open the permit page

Jul 10, 2017Completed
final sign-off Sep 2017
1 Grant Avnon structural interior alterations to the e structure. new interior walls, ceiling repairs, doors, finishes. mep lighting, fire sprinkler, life safety devices to be design build under separate permit. demo under bpa#201706219963
Details
Permit
201707101441
Status
complete
Filed
Jul 10, 2017
Permit issued
Jul 26, 2017
Final sign-off
Sep 5, 2017
Declared cost
$50,000
Address
1 Grant Av

non structural interior alterations to the e structure. new interior walls, ceiling repairs, doors, finishes. mep lighting, fire sprinkler, life safety devices to be design build under separate permit. demo under bpa#201706219963

Open the permit page

$50,000