Jimenez Construction International
- Based in
- San Rafael
- On San Francisco permits
- Jan 2026 to Jan 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2026 | Completed final sign-off Mar 2026 | 831 Cabrillo St | replace partial lightwell siding (appr 12 sq ft), replace exterior vent, repair second level ceiling from water damage, apply small amount of henry roofing material.Details
replace partial lightwell siding (appr 12 sq ft), replace exterior vent, repair second level ceiling from water damage, apply small amount of henry roofing material. | $10,000 |