Back to bathroom remodel contractors
Jim Scannell Construction
- Based in
- So San Francisco
- On San Francisco permits
- Sep 2000 to Oct 2020
- Last 24 months
- 0 permits filed
34 permits since 2000: 34 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2016 | Completed final sign-off Dec 2016 | 81 Lippard Av | bathroom remodel. change out toilet, sink, tub. no change wallsDetails
bathroom remodel. change out toilet, sink, tub. no change walls | $20,000 |
| Mar 16, 2016 | Completed final sign-off May 2016 | 743 Duncan St | bathroom remodel, replace in kindDetails
bathroom remodel, replace in kind | $17,000 |
| Sep 22, 2011 | Completed final sign-off Oct 2011 | 270 Castenada Av | sheetrock removal at upper bath location & removal at ceiling below (e) kitchen, related to new down draft venting (listed for downdraft) terminate 3' min. from p.l. & bldg opening.Details
sheetrock removal at upper bath location & removal at ceiling below (e) kitchen, related to new down draft venting (listed for downdraft) terminate 3' min. from p.l. & bldg opening. | $12,000 |
| Jul 6, 2009 | Completed final sign-off Dec 2009 | 58 San Jacinto Wy | remodel interior portion of 1st. floor for hall, mst. bedroom/bath & closet. replace existing staircase. extend entry out under existing overhang & modify entry stairs (4-risers), (44 sq. ft. added)Details
remodel interior portion of 1st. floor for hall, mst. bedroom/bath & closet. replace existing staircase. extend entry out under existing overhang & modify entry stairs (4-risers), (44 sq. ft. added) | $170,000 |
| Jun 19, 2007 | Completed final sign-off Sep 2007 | 175 Kenwood Wy | bathroom remodel of (e) bathroom. replace all fixtures. change out tile. add new lighting, install flourescent or manual occupancy sensor.Details
bathroom remodel of (e) bathroom. replace all fixtures. change out tile. add new lighting, install flourescent or manual occupancy sensor. | $22,000 |
| Jun 3, 2004 | Completed final sign-off Sep 2004 | 175 Kenwood Wy | bathroom remodel replace toilet sink and tub non structuralDetails
bathroom remodel replace toilet sink and tub non structural | $18,000 |
| Jan 22, 2004 | Completed final sign-off Aug 2004 | 175 San Leandro Wy | kchn & pantry remodel/ 1/2 bath remodel/1 window replacement not visbl from streetDetails
kchn & pantry remodel/ 1/2 bath remodel/1 window replacement not visbl from street | $60,000 |
| Oct 28, 2002 | Completed final sign-off Feb 2003 | 100 Santa Paula Av | bathroom remodel, closet alterationsDetails
bathroom remodel, closet alterations | $18,000 |