Back to bathroom remodel contractors
Jim Price Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to Sep 2011
- Last 24 months
- 0 permits filed
19 permits since 2000: 16 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2011 | Completed final sign-off Jul 2011 | 900 Bush St | repl cabinets, counter tops, plumbing fixtures in same locations. repl carpet w/wood flooring. remove non bearing closet wall, non bearing bathroom partition wall, repl doors w/new doors in same locations. no structural changes/no chanegs to plbuming or electrical.Details
repl cabinets, counter tops, plumbing fixtures in same locations. repl carpet w/wood flooring. remove non bearing closet wall, non bearing bathroom partition wall, repl doors w/new doors in same locations. no structural changes/no chanegs to plbuming or electrical. | $35,000 |
| Apr 7, 2011 | Completed final sign-off Jul 2011 | 2312 Gough St | replace cabinets and counter tops in kitchen, two bathrooms, and two wet bars, no changes to plumbing locations. repair dry rot at rear deck, no structural changes. install washer & dryer at 2nd floor wet bar location. no change in wall locationsDetails
replace cabinets and counter tops in kitchen, two bathrooms, and two wet bars, no changes to plumbing locations. repair dry rot at rear deck, no structural changes. install washer & dryer at 2nd floor wet bar location. no change in wall locations | $30,000 |
| Mar 28, 2011 | Completed final sign-off May 2011 | 4 Mars St | renovate bathroom with new bath tub, vanity, cabinet, toilet, lighting. no structural changes. no changes to walls.Details
renovate bathroom with new bath tub, vanity, cabinet, toilet, lighting. no structural changes. no changes to walls. | $15,000 |
| Sep 25, 2009 | Completed final sign-off Mar 2010 | 243 07th Av | bath remodel both units. new openign lower unit between kitchen & family room. infill airwell at 2nd floor ( addition of 12 sq ft.)Details
bath remodel both units. new openign lower unit between kitchen & family room. infill airwell at 2nd floor ( addition of 12 sq ft.) | $15,000 |