Back to bathroom remodel contractors
Jim Parr Dba Plumbing
- Based in
- Daly City
- On San Francisco permits
- Jun 2000 to Aug 2026
- Last 24 months
- 8 permits filed
195 permits since 2000: 136 completed, 8 in progress, 42 never finaled, 9 expired or cancelled.
Of the 42 never-finaled permits, 3 are 3 to 5 years old, 16 are 5 to 10 years old, 23 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 4 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2006 | Never finaled issued Nov 2006, no final | 2814 Pine St | addition of fire sprinkler system at third level per pa# 2005/08/31/1683 and ab005-bedroom and bathroom.Details
addition of fire sprinkler system at third level per pa# 2005/08/31/1683 and ab005-bedroom and bathroom. | $2,000 |