Back to bathroom remodel contractors
Jim Murphy & Associates
- Based in
- Santa Rosa
- On San Francisco permits
- May 2004 to Apr 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 5 completed, 8 never finaled.
Of the 8 never-finaled permits, 5 are 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 never finaled. Typically 6 days from filing to permit and 274 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2023 | Never finaled issued May 2023, no final | 139 24th Av | rev to pa# 202210124206, remodel extg wine storage room 110 and bathroom 107, add power sliding doors at elevator and automatic fire curtain at lower elevator door.Details
rev to pa# 202210124206, remodel extg wine storage room 110 and bathroom 107, add power sliding doors at elevator and automatic fire curtain at lower elevator door. | $30,000 |
| Feb 14, 2023 | Completed final sign-off Apr 2024 | 139 24th Av | rear bldg: interior remodel of e cottage structure, including kitchen and bath. reframe e floor at kitchen to increase interior head height. new deck structure ,, hot tub and oudoor kitchen adjacent to cottage.Details
rear bldg: interior remodel of e cottage structure, including kitchen and bath. reframe e floor at kitchen to increase interior head height. new deck structure ,, hot tub and oudoor kitchen adjacent to cottage. | $150,000 |
| Jun 14, 2022 | Never finaled issued Jun 2022, no final | 139 24th Av | front bldg-interior remodel: kitchen and baths. reconfigure (e) interior stairs to basement. addition of 2 bathrooms, replace of (e) stairs in rear. replace front windows.Details
front bldg-interior remodel: kitchen and baths. reconfigure (e) interior stairs to basement. addition of 2 bathrooms, replace of (e) stairs in rear. replace front windows. | $300,000 |
| Jul 16, 2004 | Completed final sign-off Nov 2004 | 3323 Pacific Av | paint exterior trim same color,demo/rebuild (e)back yard fence.demo 2 (e)bathrooms,remodel w/new fixDetails
paint exterior trim same color,demo/rebuild (e)back yard fence.demo 2 (e)bathrooms,remodel w/new fix | $85,000 |