Back to bathroom remodel contractors
Jim Hughes Construction Co
- Based in
- Glen Ellen
- On San Francisco permits
- Jul 2009 to Jan 2012
- Last 24 months
- 0 permits filed
8 permits since 2000: 5 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 237 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2011 | Completed final sign-off Mar 2012 | 1020 Union St | kitchen - remove (e) cabinets, drywall. install new electrical to (e) code, insulate, install new drywall, cabinets, plumbing fixtures, paint. r-13 wall insulation. bath master - remove (e) tile, drywall & bath. install new drywall & vanity. no new wall opening, (e) structure remain same.Details
kitchen - remove (e) cabinets, drywall. install new electrical to (e) code, insulate, install new drywall, cabinets, plumbing fixtures, paint. r-13 wall insulation. bath master - remove (e) tile, drywall & bath. install new drywall & vanity. no new wall opening, (e) structure remain same. | $100,000 |
| Aug 19, 2009 | Expired or cancelled expired May 2014 | 3223 Gough St | remove wall btn kitchen and study on third fl. add shower, kitchen and bathroom remodel on third fl. add one full bathroom on fourth floorDetails
remove wall btn kitchen and study on third fl. add shower, kitchen and bathroom remodel on third fl. add one full bathroom on fourth floor | $35,000 |