Back to bathroom remodel contractors
Jian Wen G
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Nov 2007
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 120 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2005 | Completed final sign-off Oct 2006 | 623 43rd Av | legalized addition built without permit,install bedroom,family room,bathroom @ g/fDetails
legalized addition built without permit,install bedroom,family room,bathroom @ g/f | $20,000 |
| Jan 2, 2001 | Completed final sign-off Mar 2001 | 1419 20th Av | add storage room at gr floor enlarge e bath and remodel e bedroom for disabled parentsDetails
add storage room at gr floor enlarge e bath and remodel e bedroom for disabled parents | $3,000 |