Back to bathroom remodel contractors
Jfieco
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Sep 2026
- Last 24 months
- 15 permits filed
53 permits since 2000: 34 completed, 10 in progress, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 11 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2026 | In progress issued Jun 2026 | 1484 Dolores St | minor interior remodel including renovation of bathroom to add 2nd full bath. addition and removal of partition walls, addition of washer dryer. addition of new window at lightwell, update lighting and electrical.Details
minor interior remodel including renovation of bathroom to add 2nd full bath. addition and removal of partition walls, addition of washer dryer. addition of new window at lightwell, update lighting and electrical. | $35,000 |
| Jun 11, 2025 | Completed final sign-off Oct 2025 | 2184 Green St | bathroom renovation - new tile, new vanity in kind. no cahnge to plumbing locations. no moving walls. approx 55 sq ft.Details
bathroom renovation - new tile, new vanity in kind. no cahnge to plumbing locations. no moving walls. approx 55 sq ft. | $15,000 |
| Jun 5, 2024 | Completed final sign-off Sep 2024 | 2934 Folsom St | (front bldg) update bathroom-in kind. new tile, newshower/shower pan, replace toilet, new vanity. all outlets in same locationsDetails
(front bldg) update bathroom-in kind. new tile, newshower/shower pan, replace toilet, new vanity. all outlets in same locations | $15,000 |
| Jan 18, 2024 | Completed final sign-off Aug 2024 | 16 17th Av | primary bathroom remodel in kind. remove bathtub and install new walk in showerDetails
primary bathroom remodel in kind. remove bathtub and install new walk in shower | $20,000 |
| Jan 11, 2024 | Completed final sign-off Aug 2025 | 2711 37th Av | convert a portion of ground floor to habitable space to add media room; bedroom & bathroom, remodel kitchen @ upper level, partially open wall btw living and dining areaDetails
convert a portion of ground floor to habitable space to add media room; bedroom & bathroom, remodel kitchen @ upper level, partially open wall btw living and dining area | $215,000 |
| Aug 23, 2023 | Completed final sign-off Aug 2025 | 2711 37th Av | remove tile and drywall to expose framing and bath & kitchen. explotory demo only - no more than 30% removal.Details
remove tile and drywall to expose framing and bath & kitchen. explotory demo only - no more than 30% removal. | $2,000 |
| Feb 28, 2022 | Completed final sign-off Jun 2022 | 1135 Ulloa St | 2/f: repair and remodel 2 bathrooms. new fixtures, same locations, new tile. remodel in kind.Details
2/f: repair and remodel 2 bathrooms. new fixtures, same locations, new tile. remodel in kind. | $30,000 |
| Aug 27, 2020 | Expired or cancelled expired Mar 2026 | 1591 45th Av | 1st floor: interior remodel of rear area. new slab on grade. remodel (e) bathroom. add (n) master bedroom & closet. (n) closet at entry. 2nd floor: add (n) deck in rear yard. remodel (e) bathroom. add & replace windows & doors in (e) bedrooms. replace siding at west facade.Details
1st floor: interior remodel of rear area. new slab on grade. remodel (e) bathroom. add (n) master bedroom & closet. (n) closet at entry. 2nd floor: add (n) deck in rear yard. remodel (e) bathroom. add & replace windows & doors in (e) bedrooms. replace siding at west facade. | $150,000 |
| Jul 14, 2020 | Completed final sign-off Dec 2020 | 995 Monterey Bl | bathroom remodel at above garage. bathroom = 7x16. replacing fixtures in-kind.Details
bathroom remodel at above garage. bathroom = 7x16. replacing fixtures in-kind. | $5,000 |
| May 11, 2020 | Completed final sign-off Sep 2021 | 69 Stratford Dr | rev to pa202002043535 for additional work: expand kitchen to breakfast area. remove walls between dining and breakfast area. remodel upper level closet. replace (e) rear facing windows with 3 new windows. (e) pa202002043535 is for remodeling of (e) kitchen & (e) upper level bathroom.Details
rev to pa202002043535 for additional work: expand kitchen to breakfast area. remove walls between dining and breakfast area. remodel upper level closet. replace (e) rear facing windows with 3 new windows. (e) pa202002043535 is for remodeling of (e) kitchen & (e) upper level bathroom. | $20,000 |
| Feb 4, 2020 | Never finaled issued Feb 2020, no final | 69 Stratford Dr | remodel kitchen and bathroom - no removal of walls.Details
remodel kitchen and bathroom - no removal of walls. | $30,000 |
| Dec 23, 2019 | Completed final sign-off Dec 2020 | 162 Funston Av | 3rd flr interior remodel. add a shoer to (e) half bath. add a closet to (e) bedroom. (n) recessed lightiing in bedrooms.Details
3rd flr interior remodel. add a shoer to (e) half bath. add a closet to (e) bedroom. (n) recessed lightiing in bedrooms. | $17,000 |
| Oct 17, 2016 | Completed final sign-off Mar 2017 | 2460 Francisco St | non-conforming (e) bath needs new shower pan, new tile, new sink and toilet. no walls to be moved. no change to layout or floor plan. all fixtures to remain at present locationsDetails
non-conforming (e) bath needs new shower pan, new tile, new sink and toilet. no walls to be moved. no change to layout or floor plan. all fixtures to remain at present locations | $13,941 |
| Feb 16, 2016 | Completed final sign-off Apr 2016 | 3436 18th St | remove (e) shower tile and (e) bath tub. install new shower valve, new shower pan, new tiles and new extractor fan.Details
remove (e) shower tile and (e) bath tub. install new shower valve, new shower pan, new tiles and new extractor fan. | $8,000 |
| Jun 20, 2014 | Expired or cancelled expired Nov 2020 | 1632 Broderick St | remove existing extractor sump pump. bring plumbing up to code, new sheetrock, tile, fixutures in bathroom, new closet, lighting in adjacent storageDetails
remove existing extractor sump pump. bring plumbing up to code, new sheetrock, tile, fixutures in bathroom, new closet, lighting in adjacent storage | $15,000 |