Jewell Construction
- Based in
- Woodland
- On San Francisco permits
- Oct 2018 to Jun 2019
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 1 days from filing to permit and 57 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2018 | Completed final sign-off Dec 2018 | 321 Precita Av | remove/replace (e) floor with new tile floor in water closet.remove all existing finishes and electrical and plumbing fixtures.new tile walls at the three walls new tile floor at tub/ sink bathroom fixture all at new location. new window at tub/shower room. add exhaust fan at tub.new sheetrock.Details
remove/replace (e) floor with new tile floor in water closet.remove all existing finishes and electrical and plumbing fixtures.new tile walls at the three walls new tile floor at tub/ sink bathroom fixture all at new location. new window at tub/shower room. add exhaust fan at tub.new sheetrock. | $60,000 |