Back to bathroom remodel contractors
Jesus Negrete
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Sep 2007
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2007 | Completed final sign-off Jan 2008 | 2400 Van Ness Av | upgrade kitchen carbinents, sink, flooring, counter and plumbing. upgrade bathroom flooring, sink, tub and toilet, add ceiling fan, 2lights, 4 switches, 5 receptacles, 3 circuits. 50% of lighting will be he lighting and they will switch seperately from non-heDetails
upgrade kitchen carbinents, sink, flooring, counter and plumbing. upgrade bathroom flooring, sink, tub and toilet, add ceiling fan, 2lights, 4 switches, 5 receptacles, 3 circuits. 50% of lighting will be he lighting and they will switch seperately from non-he | $15,000 |
| Sep 10, 2007 | Completed final sign-off Jan 2008 | 2400 Van Ness Av | kitchen: upgrade kitchen cabinets, sink, flooring, counter & plumbing/bathroom: upgrade flooring, sink, tub & toilet add ceiling fan 2 lights, 4 switches, 5 receptacles, 3 circuitsDetails
kitchen: upgrade kitchen cabinets, sink, flooring, counter & plumbing/bathroom: upgrade flooring, sink, tub & toilet add ceiling fan 2 lights, 4 switches, 5 receptacles, 3 circuits | $15,000 |
| Aug 31, 2007 | Completed final sign-off Jan 2008 | 2400 Van Ness Av | #5.kitchen: upgrade cabinets, sink, flooring, counter and plumbing. bathroom: upgrade flooring, sink, tub and toilet. add ceiling fan, 2 lights, 4 switches, 5 receptacles & 3 circuits.kitchen : at least 50% lighting wattage must be fluorescent. bathroom: fluorescent or controlled by montion sensor.Details
#5.kitchen: upgrade cabinets, sink, flooring, counter and plumbing. bathroom: upgrade flooring, sink, tub and toilet. add ceiling fan, 2 lights, 4 switches, 5 receptacles & 3 circuits.kitchen : at least 50% lighting wattage must be fluorescent. bathroom: fluorescent or controlled by montion sensor. | $15,000 |
| Jul 17, 2007 | Completed final sign-off Aug 2007 | 2400 Van Ness Av | kitchen: upgrade kchn cabinets, sink, flooring, counter, and plmg. bathroom: upgrade flooring, sink and toiletDetails
kitchen: upgrade kchn cabinets, sink, flooring, counter, and plmg. bathroom: upgrade flooring, sink and toilet | $15,000 |
| Jun 1, 2007 | Never finaled issued Jun 2007, no final | 2400 Van Ness Av | 4 kichen: upgrade kitchen cabs. kitchen sink, flooring, counters and plumbing.(no door or wndw work on this permit). 4 bathroom: upgrade bathtub, tiled walls, flooring and plmg, bathroom and kchn lighting to be fluorescent, minor repairs at kchn and bathroomDetails
4 kichen: upgrade kitchen cabs. kitchen sink, flooring, counters and plumbing.(no door or wndw work on this permit). 4 bathroom: upgrade bathtub, tiled walls, flooring and plmg, bathroom and kchn lighting to be fluorescent, minor repairs at kchn and bathroom | $54,000 |
| May 2, 2007 | Completed final sign-off Jun 2007 | 626 Powell St | kitchen: upgrade kchn cab, kchn sink, flooring, and counters. bathroom:upgrade bathtub tiled walls, flooring and plumbing fixtures inkind/bathroom and kichen. lighting to be fluorescent. minor repairs at kchn and bthroom installation to comply with title 24 energy codesDetails
kitchen: upgrade kchn cab, kchn sink, flooring, and counters. bathroom:upgrade bathtub tiled walls, flooring and plumbing fixtures inkind/bathroom and kichen. lighting to be fluorescent. minor repairs at kchn and bthroom installation to comply with title 24 energy codes | $14,500 |