Back to bathroom remodel contractors
Jerzy Olszewski *****Check Id *********
- Based in
- Hayward
- On San Francisco permits
- Jun 2005 to Oct 2020
- Last 24 months
- 0 permits filed
22 permits since 2000: 12 completed, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 13, 2020 | Never finaled issued Dec 2022, no final | 315 Green St | add a small bathroom with toilet, sink and shower to a rear storage area at the ground floor.Details
add a small bathroom with toilet, sink and shower to a rear storage area at the ground floor. | $20,000 |
| Feb 13, 2018 | Completed final sign-off Sep 2018 | 1724 Lyon St | kitchen and bathroom remodel. no structural workDetails
kitchen and bathroom remodel. no structural work | $43,000 |
| Feb 21, 2012 | Completed final sign-off Jan 2013 | 233 32nd Av | kitchen remodel, main floor bath remodel. 4th fl master suite remodel. replacement of interior doors. mechanical & electrical under pa#201202214519Details
kitchen remodel, main floor bath remodel. 4th fl master suite remodel. replacement of interior doors. mechanical & electrical under pa#201202214519 | $45,500 |
| May 21, 2009 | Completed final sign-off Jun 2009 | 2090 Pacific Av | work @ unit# 502 only. exchange bathtub, re-tile walls, dry wall, paint entire bathroom. no new exhaust system.Details
work @ unit# 502 only. exchange bathtub, re-tile walls, dry wall, paint entire bathroom. no new exhaust system. | $2,000 |
| Jul 10, 2008 | Expired or cancelled expired May 2011 | 1394 Mcallister St | bathroom remodeling, closet reconfiguration, demo, plumbing, toilet, double sink, shower, electrical, insulation, new drywall, tiles and new kitchen carbinets on the 3rd floor.Details
bathroom remodeling, closet reconfiguration, demo, plumbing, toilet, double sink, shower, electrical, insulation, new drywall, tiles and new kitchen carbinets on the 3rd floor. | $20,000 |
| Jan 23, 2007 | Completed final sign-off Mar 2008 | 101 States St | interior remodel of existing condominium unit to include bathroom and closet reconfiguration and replacement of windows. windows not visible from street.Details
interior remodel of existing condominium unit to include bathroom and closet reconfiguration and replacement of windows. windows not visible from street. | $27,500 |