Back to bathroom remodel contractors
Jerry Zbrzezny
- Based in
- San Bruno
- On San Francisco permits
- Jul 2002 to Jul 2018
- Last 24 months
- 0 permits filed
54 permits since 2000: 33 completed, 5 never finaled, 16 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 11 completed, 3 never finaled, 6 expired or cancelled. Typically 0 days from filing to permit and 329 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2017 | Completed final sign-off Oct 2019 | 717 10th Av | add two bedroom, 2 bathroom and kitchen new unit on 1st floor.Details
add two bedroom, 2 bathroom and kitchen new unit on 1st floor. | $110,000 |
| Jun 17, 2016 | Completed final sign-off Jun 2018 | 306 Ashton Av | remodel kitchen & (2) bathrooms; install new lights, update plumbing & electrical; new cabinets, tile, countertops.Details
remodel kitchen & (2) bathrooms; install new lights, update plumbing & electrical; new cabinets, tile, countertops. | $50,000 |
| Jun 8, 2015 | Completed final sign-off May 2016 | 301 24th Av | unit #307: interior remodel for unit #307 at 3rd flr, remove (e) partition walls and add bath.Details
unit #307: interior remodel for unit #307 at 3rd flr, remove (e) partition walls and add bath. | $20,000 |
| May 18, 2015 | Completed final sign-off Nov 2015 | 2501 30th Av | remodel bathroom, dining room and living room. remove/replace wall coverings within these rooms and insulate where ever possible. new lighting, no wall modification, no structural work, comply with cec 150.0(k)Details
remodel bathroom, dining room and living room. remove/replace wall coverings within these rooms and insulate where ever possible. new lighting, no wall modification, no structural work, comply with cec 150.0(k) | $10,000 |
| Apr 30, 2015 | Completed final sign-off May 2016 | 301 24th Av | remodel unit 305: remodel e kitchen and bath, add new bath. modify e partition walls. replace e garage doors in kindDetails
remodel unit 305: remodel e kitchen and bath, add new bath. modify e partition walls. replace e garage doors in kind | $20,000 |
| Sep 12, 2014 | Expired or cancelled expired Nov 2019 | 2177 O'farrell St | change of use from r-3 occup to r-2 occup. add new residential unit at 1st fl level. add bath and kitchen upgrade beam and postsDetails
change of use from r-3 occup to r-2 occup. add new residential unit at 1st fl level. add bath and kitchen upgrade beam and posts | $40,000 |
| Sep 12, 2014 | Never finaled issued Sep 2014, no final | 301 24th Av | unit #301 on 2nd floor interior remodeling - adding a 2nd bathroom for same unit.Details
unit #301 on 2nd floor interior remodeling - adding a 2nd bathroom for same unit. | $20,000 |
| Jul 28, 2014 | Expired or cancelled expired Nov 2019 | 2177 O'farrell St | remodel unit # 2179 ofarrell street. modify and relocate kitchen, new bath room. remodel ext bath rooms, modify walls, infill at third story and first story.Details
remodel unit # 2179 ofarrell street. modify and relocate kitchen, new bath room. remodel ext bath rooms, modify walls, infill at third story and first story. | $20,000 |
| Jun 9, 2014 | Expired or cancelled expired Nov 2019 | 2177 O'farrell St | remodel (e) residential bldg @ upper level apt & garage level. add new bathroom @ upper level, relocate kitchen & create at prevsious kitchen location. partition wall modification @ 3rd floor & 1st story.Details
remodel (e) residential bldg @ upper level apt & garage level. add new bathroom @ upper level, relocate kitchen & create at prevsious kitchen location. partition wall modification @ 3rd floor & 1st story. | $45,000 |
| Feb 20, 2014 | Never finaled issued Feb 2014, no final | 307 24th Av | upgrade electrical and plumbing, replace/refinish damage floors, insulate 2 bath demo, replace or repair doors, install new drywall sound proof ceiling, tile install new cabinets, granite counter, replace appliances, prime, paint. no change on walls.Details
upgrade electrical and plumbing, replace/refinish damage floors, insulate 2 bath demo, replace or repair doors, install new drywall sound proof ceiling, tile install new cabinets, granite counter, replace appliances, prime, paint. no change on walls. | $40,000 |
| Apr 4, 2012 | Completed final sign-off May 2012 | 155 Wawona St | remodel (e) bathroom. retile, new toilet, sink, light, fan on 2nd floor. lighting will comply w/ cec 150 (k)Details
remodel (e) bathroom. retile, new toilet, sink, light, fan on 2nd floor. lighting will comply w/ cec 150 (k) | $10,000 |
| Jun 7, 2010 | Completed final sign-off Nov 2011 | 232 21st Av | comply with nov # 201036839. remodel kitchen and bath in apt. # 2, 3 & 5. repair water damage inside and outside under 200901230731. provide flourescent lights per t - 24. correct housing violations, repair ext. siding and stucco same size and location of baths and kitchens.Details
comply with nov # 201036839. remodel kitchen and bath in apt. # 2, 3 & 5. repair water damage inside and outside under 200901230731. provide flourescent lights per t - 24. correct housing violations, repair ext. siding and stucco same size and location of baths and kitchens. | $70,000 |
| Feb 2, 2010 | Completed final sign-off Aug 2010 | 878 35th Av | alteration of 520 sq.ft. for new playroom and bathroom replacement of (e) stair and relocation of (e) column. replacement of (e) windows with new ones. replacement of (e) water heater withe new one.Details
alteration of 520 sq.ft. for new playroom and bathroom replacement of (e) stair and relocation of (e) column. replacement of (e) windows with new ones. replacement of (e) water heater withe new one. | $40,000 |
| Mar 13, 2009 | Completed final sign-off Oct 2009 | 1102 York St | kitchen & bath remodel. repair broken windows & doors. correct notice of violation #200885497 work by 2819 - 23rd st. to comply w/ his nov 200885497 dated 12/18/2008. provide high efficiency lighting per title 24 lighting mandatory measures.Details
kitchen & bath remodel. repair broken windows & doors. correct notice of violation #200885497 work by 2819 - 23rd st. to comply w/ his nov 200885497 dated 12/18/2008. provide high efficiency lighting per title 24 lighting mandatory measures. | $22,000 |
| Mar 10, 2009 | Completed final sign-off Aug 2009 | 2454 47th Av | remodel kitchen and bathroom. add shower, repair termite and dryrot damage. replace 2 windows, front wall framing, and restucco.Details
remodel kitchen and bathroom. add shower, repair termite and dryrot damage. replace 2 windows, front wall framing, and restucco. | $40,000 |
| Jan 23, 2009 | Expired or cancelled expired Nov 2011 | 232 21st Av | work @ apt#1,#4,& #6. remodel kitchen & bathroom. repair water damage & termite provide fluorescent lights per t-24. no structural change. no wall renoval or replacement. same size & location of bathroom & kitchens.Details
work @ apt#1,#4,& #6. remodel kitchen & bathroom. repair water damage & termite provide fluorescent lights per t-24. no structural change. no wall renoval or replacement. same size & location of bathroom & kitchens. | $70,000 |
| Jul 17, 2008 | Expired or cancelled expired Mar 2017 | 2502 Cabrillo St | remodel 2 kitchen + 2 bathroom. remove 2 flues. some new lighting no structural work. min 50% of kitchen light watts in fluorescent. provide fluorescent lights or "manual on" occupany sensor in bathroom.Details
remodel 2 kitchen + 2 bathroom. remove 2 flues. some new lighting no structural work. min 50% of kitchen light watts in fluorescent. provide fluorescent lights or "manual on" occupany sensor in bathroom. | $29,248 |
| Sep 25, 2006 | Never finaled issued Sep 2006, no final | 2508 Cabrillo St | remodel kchn and bathroom. repair water damage to framing and garage door header due to leaking tub(remove flue) at garage only. no wndws . no doorsDetails
remodel kchn and bathroom. repair water damage to framing and garage door header due to leaking tub(remove flue) at garage only. no wndws . no doors | $15,000 |
| Jul 10, 2006 | Expired or cancelled expired Apr 2008 | 2502 Cabrillo St | unit #2506 - kitchen & bath remodel - no new wall, no new light.Details
unit #2506 - kitchen & bath remodel - no new wall, no new light. | $15,000 |
| Jun 9, 2006 | Completed final sign-off Mar 2008 | 311 Lakeshore Dr | 2 story horizontal addition. garage expansion, new laundry & bathroom, ground floor. bedroom expansion, bathroom configuration, upper floor.Details
2 story horizontal addition. garage expansion, new laundry & bathroom, ground floor. bedroom expansion, bathroom configuration, upper floor. | $40,000 |