Jerry Caldwell
- Based in
- El Cerrito
- On San Francisco permits
- Apr 2018 to Jun 2018
- Last 24 months
- 0 permits filed
5 permits since 2000: 1 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2018 | Expired or cancelled cancelled Feb 2024 | 1150 Ocean Av | installation of 2 18kw/29.6 lithium ion battery storage units. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking software. ** maher: n/a **Details
installation of 2 18kw/29.6 lithium ion battery storage units. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking software. ** maher: n/a ** | $11,077 |
| Jun 8, 2018 | Expired or cancelled cancelled Nov 2022 | 2001 Market St | installation of 1 18kw/29.6kwh lithium ion battery storage unit. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking softwareDetails
installation of 1 18kw/29.6kwh lithium ion battery storage unit. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking software | $10,024 |
| Jun 8, 2018 | Expired or cancelled cancelled Nov 2022 | 399 04th St | installation of 4 stem 18kw/29.6kwh lithium ion battery storage units. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking software.Details
installation of 4 stem 18kw/29.6kwh lithium ion battery storage units. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking software. | $36,380 |
| Jun 8, 2018 | Expired or cancelled cancelled Feb 2024 | 450 Rhode Island St | installtion of 2 18kw/29.6kwh lithium ion battery storage unit. this will be utilized to offset peak demand by discharging during periods of high demand. the monitoring system will be installed as a tracking software. ** maher: n/a **Details
installtion of 2 18kw/29.6kwh lithium ion battery storage unit. this will be utilized to offset peak demand by discharging during periods of high demand. the monitoring system will be installed as a tracking software. ** maher: n/a ** | $10,849 |
| Apr 30, 2018 | Completed final sign-off Jun 2018 | 1375 Van Dyke Av | installation of battery & inverter cabinet, monitoring and communication boxex, connecte via, circuit breaker in main service panel. all equipment to be install in (e) ele roomDetails
installation of battery & inverter cabinet, monitoring and communication boxex, connecte via, circuit breaker in main service panel. all equipment to be install in (e) ele room | $4,000 |