Jeremy Moore Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2014 to May 2019
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 61 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2017 | Completed final sign-off Sep 2017 | 1751 45th Av | replace (e) deteriorated redwood deck and relocate (e) non-conforming stairs to comply with current regulations. inspect front for dryrot. replace dryrot windows, trim at front. replace near aluminum windows w/vinyl.Details
replace (e) deteriorated redwood deck and relocate (e) non-conforming stairs to comply with current regulations. inspect front for dryrot. replace dryrot windows, trim at front. replace near aluminum windows w/vinyl. | $12,000 |