Back to bathroom remodel contractors
Jerald Construction
- Based in
- Daly City
- On San Francisco permits
- May 2004 to Jul 2026
- Last 24 months
- 7 permits filed
22 permits since 2000: 15 completed, 4 in progress, 3 never finaled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 7 completed, 2 in progress, 1 never finaled. Typically 5 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2026 | In progress issued Jul 2026 | 543 18th Av | remodel bathroom like for like, update plumbing.Details
remodel bathroom like for like, update plumbing. | $10,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 4096 Folsom St | ground fl: to add 1 family rm, kitchenette & bedroom, remodel a full bathroom, relocate & renew (e) furnace. 2nd fl: remodel (e) kitchen and one full bathroom, add one full bath.Details
ground fl: to add 1 family rm, kitchenette & bedroom, remodel a full bathroom, relocate & renew (e) furnace. 2nd fl: remodel (e) kitchen and one full bathroom, add one full bath. | $12,000 |
| Sep 13, 2021 | Completed final sign-off Apr 2022 | 55 Knollview Wy | remodel lower level bathroom and closet areas. it will be extend. new plumbing in bathroom and laundry, new windows @ read. new framing works in closet area.Details
remodel lower level bathroom and closet areas. it will be extend. new plumbing in bathroom and laundry, new windows @ read. new framing works in closet area. | $42,000 |
| Jun 25, 2021 | Completed final sign-off Apr 2022 | 2440 14th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $26,000 |
| Jun 12, 2020 | Completed final sign-off Oct 2023 | 931 Grove St | remodel 2 baths one in each unit. remodel 2 kitchen, 1 in each unit, convert 2 separated closets in bedroom 1 into integral closet without structural changes.Details
remodel 2 baths one in each unit. remodel 2 kitchen, 1 in each unit, convert 2 separated closets in bedroom 1 into integral closet without structural changes. | $150,000 |
| Sep 13, 2018 | Never finaled issued Sep 2020, no final | 107 Cypress St | new unit at existing garage & existing storage. 2 bedrooms & kitchen, living, dining & bath.Details
new unit at existing garage & existing storage. 2 bedrooms & kitchen, living, dining & bath. | $62,000 |
| Aug 10, 2017 | Completed final sign-off Dec 2017 | 658 Cole St | remodel existing bathroom, add one bathroom, add closets.Details
remodel existing bathroom, add one bathroom, add closets. | $15,000 |
| Apr 3, 2017 | Completed final sign-off Jul 2017 | 1141 Mendell St | remodel kitchen with new kitchen cabinets (san layout) & new appliances ( only stove & fridge), remodel bathroom, replaceing the shower bathtub, toilet & vanity sink. no walls moved removed, added or infilled. all existing layouts to remain.Details
remodel kitchen with new kitchen cabinets (san layout) & new appliances ( only stove & fridge), remodel bathroom, replaceing the shower bathtub, toilet & vanity sink. no walls moved removed, added or infilled. all existing layouts to remain. | $30,500 |
| Apr 3, 2017 | Completed final sign-off Jun 2017 | 128 Caine Av | connect roof storm water drainage (gutter system) to rain box locate under the main stairs of the property with complaint #201756881, remodel bathroom in like kind. no walls moved removed, added or infilled. all existing layouts to remain unchanged.Details
connect roof storm water drainage (gutter system) to rain box locate under the main stairs of the property with complaint #201756881, remodel bathroom in like kind. no walls moved removed, added or infilled. all existing layouts to remain unchanged. | $17,000 |
| Apr 7, 2016 | Completed final sign-off Sep 2016 | 55 Knollview Wy | remodel bathroom on 2/f, remove (e) tub/sink/cabinet/toilet, eliminate shower room & convert to closet, install bathroom vent exhaust terminating 3/f from pl & openings.Details
remodel bathroom on 2/f, remove (e) tub/sink/cabinet/toilet, eliminate shower room & convert to closet, install bathroom vent exhaust terminating 3/f from pl & openings. | $8,000 |