Back to bathroom remodel contractors
Jema Construction Inc
- Based in
- Baldwin Park
- On San Francisco permits
- Apr 2011 to Aug 2013
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 206 days from filing to permit and 708 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2013 | Completed final sign-off Sep 2014 | 40 Rosewood Dr | 2 bathrooms remodel, kitchen remodel, replace sheetrock & elect. outlets panel & plumbing pipes. to comply cec 150 (k) 8 & 10; replace 4 windows all at sides of the house. u-factor max. 0.4.Details
2 bathrooms remodel, kitchen remodel, replace sheetrock & elect. outlets panel & plumbing pipes. to comply cec 150 (k) 8 & 10; replace 4 windows all at sides of the house. u-factor max. 0.4. | $110,000 |
| Jan 13, 2012 | Completed final sign-off Aug 2014 | 367 17th Av | horizontal additon @ rear ground fl- add bathroom, bedroom, family rm. 2nd fl-horizontal addition+ interior alteration , add roof deck, bath. 3rd fl-horiz. addition + interior alterations.Details
horizontal additon @ rear ground fl- add bathroom, bedroom, family rm. 2nd fl-horizontal addition+ interior alteration , add roof deck, bath. 3rd fl-horiz. addition + interior alterations. | $350,000 |
| Apr 1, 2011 | Completed final sign-off Jun 2014 | 463 Eureka St | enlarge garage & add one bedrm, one & half bathroom & one family room at lower level,convert (e) bedrooms & storage rms to living room, dining rm, kitchen & one bathrm at main level, convert (e) living rm, dining room & kitchen to 3 bedrms & 2 bathrms at upper level, add railing for (n) roof deck.Details
enlarge garage & add one bedrm, one & half bathroom & one family room at lower level,convert (e) bedrooms & storage rms to living room, dining rm, kitchen & one bathrm at main level, convert (e) living rm, dining room & kitchen to 3 bedrms & 2 bathrms at upper level, add railing for (n) roof deck. | $105,000 |