Jeffrey R Rexford
- Based in
- Concord
- On San Francisco permits
- Jan 2012 to Apr 2014
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 11, 2012 | Completed final sign-off May 2012 | 121 Chicago Wy | remove dry rotted deck and stair, replace with new deck and stair. remove concrete walkway, remove grass, provide new drought tolerant native california landscaping. all work is in rear yard,does not encroch into rear yard setbackDetails
remove dry rotted deck and stair, replace with new deck and stair. remove concrete walkway, remove grass, provide new drought tolerant native california landscaping. all work is in rear yard,does not encroch into rear yard setback | $50,000 |