Back to bathroom remodel contractors
Jech Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Jun 2021
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2021 | Completed final sign-off Aug 2022 | 64 Dorland St | revision to permit 202103126477(no plans)to remodel (e) kitchen and bath. wall modification @ (e) bathroom & add powder room.Details
revision to permit 202103126477(no plans)to remodel (e) kitchen and bath. wall modification @ (e) bathroom & add powder room. | $26,000 |
| Mar 12, 2021 | Never finaled issued Mar 2021, no final | 64 Dorland St | replace upper and lower sash on 12 windows. replace kitchen cabinets, sink, countertop, and flooring. u factor 0.30 max, replace all tile, tub, vanity in bathroom and powder room.Details
replace upper and lower sash on 12 windows. replace kitchen cabinets, sink, countertop, and flooring. u factor 0.30 max, replace all tile, tub, vanity in bathroom and powder room. | $48,000 |
| Apr 13, 2015 | Completed final sign-off Jul 2015 | 692 Clipper St | reroute all plumbing drain lines in (2) baths on 1/f to ejection pump.Details
reroute all plumbing drain lines in (2) baths on 1/f to ejection pump. | $35,000 |
| May 1, 2012 | Completed final sign-off Jun 2012 | 1522 Sanchez St | 3rd floor bathroom remodel, relocate toilet & sink. install new bathtub. no structural work.Details
3rd floor bathroom remodel, relocate toilet & sink. install new bathtub. no structural work. | $12,000 |
| Aug 18, 2011 | Completed final sign-off Jun 2012 | 1522 Sanchez St | remodel kitchen at 2nd floor, bedroom #2 at 3rd floor and new finishes at master bath.new doors at dining.Details
remodel kitchen at 2nd floor, bedroom #2 at 3rd floor and new finishes at master bath.new doors at dining. | $88,000 |
| Nov 16, 2004 | Expired or cancelled expired Mar 2006 | 3968 26th St | add skylights, hallway, kitchen & bath, revise pa 200411028292Details
add skylights, hallway, kitchen & bath, revise pa 200411028292 |