Jebl Engineering & Construction Inc
- Based in
- San Luis Obispo
- On San Francisco permits
- Dec 2025 to Dec 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2025 | Completed final sign-off Apr 2026 | 317 Mississippi St | solar permit: installing 11 solar pv modules, 425 watts per module, total no. of rating 4.675 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 10 kwh each in capacity, ess units will not be closer than 3 feet | installation of roof mount solar pvDetails
solar permit: installing 11 solar pv modules, 425 watts per module, total no. of rating 4.675 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 10 kwh each in capacity, ess units will not be closer than 3 feet | installation of roof mount solar pv | $31,943 |
| Dec 1, 2025 | Completed final sign-off Apr 2026 | 317 Mississippi St | solar permit: installing 11 solar pv modules, 425 watts per module, total no. of rating 4.675 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 10 kwh in capacityDetails
solar permit: installing 11 solar pv modules, 425 watts per module, total no. of rating 4.675 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 10 kwh in capacity |