Jean-Luc Ascencio
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Oct 2024
- Last 24 months
- 0 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2024 | Completed final sign-off Feb 2025 | 1235 09th Av | revision to pa 202107164557 non-structural remodel of existing restaurant including new bar/seating counter, new dining area layout, expansion of dining into outdoor area, p all existing kitchen equipment to remain.Details
revision to pa 202107164557 non-structural remodel of existing restaurant including new bar/seating counter, new dining area layout, expansion of dining into outdoor area, p all existing kitchen equipment to remain. | $100,000 |
| Feb 26, 2020 | Completed final sign-off Jul 2020 | 4341 26th St | upstairs bathroom remodeling - replace tub with shower. no structural change.Details
upstairs bathroom remodeling - replace tub with shower. no structural change. | $3,000 |
| Mar 7, 2019 | Completed final sign-off Sep 2019 | 1747 42nd Av | replace both front windows w/full-length aluminum-clad wood triple casements (casement/fixed/casement) w/in (e) openings and two at rear. no other work. wood w/ aluminum clad 2 front, 2 rear. no structural work. u factor shall not be more than 0.32.Details
replace both front windows w/full-length aluminum-clad wood triple casements (casement/fixed/casement) w/in (e) openings and two at rear. no other work. wood w/ aluminum clad 2 front, 2 rear. no structural work. u factor shall not be more than 0.32. | $4,000 |
| Feb 25, 2019 | Completed final sign-off Sep 2019 | 1747 42nd Av | bathroom & kitchen remodelDetails
bathroom & kitchen remodel | $65,000 |
| Sep 9, 2011 | Completed final sign-off Apr 2012 | 2934 22nd St | remodel (e) kitchen , dining room. remove (e) brick fire place and chimneyDetails
remodel (e) kitchen , dining room. remove (e) brick fire place and chimney | $25,000 |
| Jun 6, 2003 | Completed final sign-off Jun 2003 | 777 Rhode Island St | remove old shingles & trims, replace w/new cedar shingles & new trims, following identical layout-alDetails
remove old shingles & trims, replace w/new cedar shingles & new trims, following identical layout-al | $4,000 |
| Apr 28, 2003 | Completed final sign-off Jun 2003 | 1916 Pine St | 10 windows replacement all aroundDetails
10 windows replacement all around | $4,000 |
| Feb 7, 2003 | Completed final sign-off Mar 2003 | 742 Castro St | repair rear stairs <50% to comply with nov#20023555Details
repair rear stairs <50% to comply with nov#20023555 | $558 |
| Jan 10, 2002 | Completed final sign-off Mar 2002 | 424 Texas St | remodel downstair bathroom, new drywall, new floor, tile, plumbing, electrical. no structural workDetails
remodel downstair bathroom, new drywall, new floor, tile, plumbing, electrical. no structural work | $8,000 |
| Feb 9, 2001 | Completed final sign-off Jul 2001 | 4319 Cesar Chavez St | kitchen & bath remodelDetails
kitchen & bath remodel | $15,000 |
| Sep 7, 2000 | Completed final sign-off Jan 2001 | 2427 Divisadero St | kitchen remodeling, removal of old cabinets, & dry wall, install new cabinets & appliances, etcDetails
kitchen remodeling, removal of old cabinets, & dry wall, install new cabinets & appliances, etc | $15,000 |