Back to bathroom remodel contractors
Jean Design Build Inc
- Based in
- Daly City
- On San Francisco permits
- Aug 2023 to Aug 2026
- Last 24 months
- 11 permits filed
16 permits since 2000: 13 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 18 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 440 Crestlake Dr | in-kind remodeling of 2 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 2nd fl with 1 shower pan(s). | $65,000 |
| Oct 20, 2025 | Completed final sign-off Jun 2026 | 1527 30th Av | enclose ground floor space under existing 2nd floor office. convert unconditioned floor space to habitable space, remove w/c , add bath and closet.Details
enclose ground floor space under existing 2nd floor office. convert unconditioned floor space to habitable space, remove w/c , add bath and closet. | $55,000 |
| Sep 5, 2024 | Completed final sign-off Dec 2025 | 1527 30th Av | remodel 2 bedrooms, hall and baths. add one sink, shower and toilet. remove non conforming non egress stairDetails
remodel 2 bedrooms, hall and baths. add one sink, shower and toilet. remove non conforming non egress stair | $120,000 |
| Jan 19, 2024 | Completed final sign-off Nov 2024 | 2 Amber Dr | complete renovation of (e) condo new vanity toilet shower/tub for bathroom new lighting throughtout new floors paint no change to (e) layoutDetails
complete renovation of (e) condo new vanity toilet shower/tub for bathroom new lighting throughtout new floors paint no change to (e) layout | $140,000 |
| Oct 18, 2023 | Completed final sign-off Apr 2024 | 522 France Av | rev to pa# 2023-1018-8913; converting unhabitable space on 1st fl to a habitable master room, bathroom, office, and laundry. adding wall finishes to garage.Details
rev to pa# 2023-1018-8913; converting unhabitable space on 1st fl to a habitable master room, bathroom, office, and laundry. adding wall finishes to garage. | $150,000 |