Back to bathroom remodel contractors
Jdesignbuild
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Mar 2026
- Last 24 months
- 4 permits filed
39 permits since 2000: 33 completed, 2 in progress, 4 never finaled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 14 completed, 2 in progress, 1 never finaled. Typically 11 days from filing to permit and 221 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2026 | In progress issued Apr 2026 | 245 Richland Av | add new habitable space on ground flr w/ 1-bedroom, 1-bathroom, closet, media room, laundry & powder room. replace & relocate (e) furnace & water heater on ground flr. reconfigure 2/f, replace 14 windows & add 3 skylights, rebuild & reduce (e) deck at rear.Details
add new habitable space on ground flr w/ 1-bedroom, 1-bathroom, closet, media room, laundry & powder room. replace & relocate (e) furnace & water heater on ground flr. reconfigure 2/f, replace 14 windows & add 3 skylights, rebuild & reduce (e) deck at rear. | $250,000 |
| Jan 21, 2025 | Completed final sign-off Oct 2025 | 1619 Noe St | remodel and reconfigure e 2 story single family dwelling. relocate e kitchen, relocate e bath 2nd fl.add 1 bath,bdrm, powder room, movie room and laundry at gr fl. relocate furnace and replace water heater. replace e windows in kind.Details
remodel and reconfigure e 2 story single family dwelling. relocate e kitchen, relocate e bath 2nd fl.add 1 bath,bdrm, powder room, movie room and laundry at gr fl. relocate furnace and replace water heater. replace e windows in kind. | $150,000 |
| Nov 27, 2024 | In progress issued Dec 2024 | 375 Richland Av | remodel (e) single family home. (n) skylight & (n) laundry at 3rd fl. add two half baths. replace & relocate water heater & furnace. replace all windows within (e) opening in kind. repair dry rot front exterior staircaseDetails
remodel (e) single family home. (n) skylight & (n) laundry at 3rd fl. add two half baths. replace & relocate water heater & furnace. replace all windows within (e) opening in kind. repair dry rot front exterior staircase | $100,000 |
| Oct 18, 2023 | Completed final sign-off May 2024 | 763 Chenery St | one bathroom remodel- ground floorDetails
one bathroom remodel- ground floor | $5,000 |
| Sep 21, 2022 | Completed final sign-off Nov 2024 | 745 10th Av | new horizontal addition to (e) single family home. raise lowered roof at rear extension at home. infill lightwell on top floor. renovate kitchen and baths. adu under pa# 202209212897.Details
new horizontal addition to (e) single family home. raise lowered roof at rear extension at home. infill lightwell on top floor. renovate kitchen and baths. adu under pa# 202209212897. | $145,000 |
| Feb 22, 2022 | Completed final sign-off Feb 2023 | 30 Temescal Tr | replace tile flooring and tile wall in one bathroom. all work in kind.no other work.Details
replace tile flooring and tile wall in one bathroom. all work in kind.no other work. | $2,000 |
| Feb 11, 2022 | Completed final sign-off Mar 2023 | 674 29th St | rebuild rear sun room in-kind. remove (e) exterior stair. remodel (e) kitchen and bath. relocate two bathrooms. add (n) interior stair. remodel part of (e) storage into a sitting room.Details
rebuild rear sun room in-kind. remove (e) exterior stair. remodel (e) kitchen and bath. relocate two bathrooms. add (n) interior stair. remodel part of (e) storage into a sitting room. | $280,000 |
| Dec 11, 2020 | Completed final sign-off Sep 2021 | 851 Cole St | unit 851: add bathroom & closets. enclose dining room.Details
unit 851: add bathroom & closets. enclose dining room. | $25,000 |
| Sep 13, 2019 | Completed final sign-off May 2020 | 1825 44th Av | add master bedroom & bath to ground fl. add laundry room to ground fl. relocate furnace & replace water heater, reconfigure 2nd fl & add 1 bedroom & bathDetails
add master bedroom & bath to ground fl. add laundry room to ground fl. relocate furnace & replace water heater, reconfigure 2nd fl & add 1 bedroom & bath | $70,000 |
| Sep 10, 2019 | Never finaled issued Sep 2019, no final | 1825 44th Av | exploratory demolition of plaster, lath, bath & living room. approximately 100 sqftDetails
exploratory demolition of plaster, lath, bath & living room. approximately 100 sqft | $2,000 |
| Jul 5, 2019 | Completed final sign-off Dec 2019 | 175 Mayfair Dr | replace cabinets in kitchen, tile; upgrade master bath, tile @ 2/f in-kind. same layoutDetails
replace cabinets in kitchen, tile; upgrade master bath, tile @ 2/f in-kind. same layout | $10,000 |
| Mar 19, 2019 | Completed final sign-off Sep 2019 | 477 Euclid Av | bathrooms & kitchen remodel. laumdry: paint, tile, fixtures. 500 sq ft remodel in same location.Details
bathrooms & kitchen remodel. laumdry: paint, tile, fixtures. 500 sq ft remodel in same location. | $85,000 |
| Dec 24, 2018 | Completed final sign-off Feb 2019 | 847 Cole St | rev to pa# 201706159422 to delete skylights from 2 bathrooms, remove parapets at skylights, change roof raming to eliminate skylight openingsDetails
rev to pa# 201706159422 to delete skylights from 2 bathrooms, remove parapets at skylights, change roof raming to eliminate skylight openings | |
| Nov 28, 2018 | Completed final sign-off Aug 2019 | 3753 17th St | add half bath in upper unitDetails
add half bath in upper unit | $2,500 |
| Mar 29, 2018 | Completed final sign-off Aug 2018 | 665 19th Av | legalize storage space on ground floor: comply with physical inspection report #cc-8252. repair sheetrock in ceiling of basement. bring kitchen and bathroom up to code on 2nd floor. electrical report. smoke alarms/carbon monoxide detectors.Details
legalize storage space on ground floor: comply with physical inspection report #cc-8252. repair sheetrock in ceiling of basement. bring kitchen and bathroom up to code on 2nd floor. electrical report. smoke alarms/carbon monoxide detectors. | $2,500 |
| Jul 7, 2017 | Completed final sign-off Dec 2017 | 726 Lyon St | convert laundry room at rear of home to full bath with stackable laundry unit. (1 bath, 1 toilet, 1 vanity, washer/dryer)Details
convert laundry room at rear of home to full bath with stackable laundry unit. (1 bath, 1 toilet, 1 vanity, washer/dryer) | $10,000 |
| Dec 29, 2016 | Completed final sign-off Feb 2019 | 3025 Cesar Chavez St | horizontal addition @ 1st story: (n) bath, living room & wetbar. add (n) internal stair connecting 1st & 2nd story. reconstruct 2nd story rear room w/ powder room & laundryDetails
horizontal addition @ 1st story: (n) bath, living room & wetbar. add (n) internal stair connecting 1st & 2nd story. reconstruct 2nd story rear room w/ powder room & laundry | $70,000 |