Jd Group Inc
- Based in
- Los Angeles
- On San Francisco permits
- Mar 2010 to Aug 2010
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2010 | Never finaled issued Aug 2010, no final | 3450 Washington St | move laundry room; reconfigure interior walls & doors; move 1 door in master bedroom less than 10' high; add spiral staircase to exterior existing balcony.Details
move laundry room; reconfigure interior walls & doors; move 1 door in master bedroom less than 10' high; add spiral staircase to exterior existing balcony. | $90,000 |
| Mar 15, 2010 | Completed final sign-off Jun 2010 | 3450 Washington St | bathroom remodel for 4 bathrooms , all non structural workm one kitchen remodel, non struc, replace 7 windows in kind not visible from street, one patio door in kind. all baths and kitchens are existing, not adding fixtures. replace most hard wd flooring. work on 2nd, 3rd and 4th floors.Details
bathroom remodel for 4 bathrooms , all non structural workm one kitchen remodel, non struc, replace 7 windows in kind not visible from street, one patio door in kind. all baths and kitchens are existing, not adding fixtures. replace most hard wd flooring. work on 2nd, 3rd and 4th floors. | $200,000 |
| Mar 12, 2010 | Expired or cancelled withdrawn Mar 2010 | 3850 Washington St | bathroom remodel for 4 bathrooms all non structural work, 1 kitchen remodel non structural, replace 7 windows in kind and 1 door in kind, windows at rear of bldg not visible from st. all baths & kitchen are existing, replace most hardwood flooring.Details
bathroom remodel for 4 bathrooms all non structural work, 1 kitchen remodel non structural, replace 7 windows in kind and 1 door in kind, windows at rear of bldg not visible from st. all baths & kitchen are existing, replace most hardwood flooring. | $200,000 |