Back to bathroom remodel contractors
Jce Building & Development Inc.
- Based in
- Pacifica
- On San Francisco permits
- Aug 2011 to Aug 2026
- Last 24 months
- 3 permits filed
22 permits since 2000: 14 completed, 3 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 5 completed, 1 in progress, 2 never finaled. Typically 70 days from filing to permit and 1052 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2026 | In progress issued May 2026 | 3630 Market St | new bathroom at 2nd fl. remove damaged deck. install new guardrail, replace kitchen cabinets. replace (e) window w/ retrofit windows. ref 202605271942Details
new bathroom at 2nd fl. remove damaged deck. install new guardrail, replace kitchen cabinets. replace (e) window w/ retrofit windows. ref 202605271942 | $15,000 |
| Nov 9, 2021 | Completed final sign-off Nov 2024 | 307 Castro St | unit 2: relocation and renovation of kitchen. remodel (e) bathroom. add a new bathroom. remove wall between dining and bedroom to create larger living room.Details
unit 2: relocation and renovation of kitchen. remodel (e) bathroom. add a new bathroom. remove wall between dining and bedroom to create larger living room. | $54,000 |
| Jun 15, 2021 | Completed final sign-off Nov 2023 | 288 Union St | project consists of converting (e) 1st floor area of (e) 4 story multifamily building (3 dwelling units) into an adu (of 607 sq ft, 1 bedroom, 1 bath). work limited to non-structural fixtures only. no changes to existing structural foundation/framing, building footprint or exterior proposed.Details
project consists of converting (e) 1st floor area of (e) 4 story multifamily building (3 dwelling units) into an adu (of 607 sq ft, 1 bedroom, 1 bath). work limited to non-structural fixtures only. no changes to existing structural foundation/framing, building footprint or exterior proposed. | $50,000 |
| Sep 22, 2020 | Never finaled issued Sep 2022, no final | 3324 Divisadero St | lower floor seismic reinforcement, eliminate post and install new beam to allow for more parking. remodel rec room, bathroom and wet bar at ground floor, modify support of rear deck, remodel kitchen at third floor, install new electrical subpanel.Details
lower floor seismic reinforcement, eliminate post and install new beam to allow for more parking. remodel rec room, bathroom and wet bar at ground floor, modify support of rear deck, remodel kitchen at third floor, install new electrical subpanel. | $75,000 |
| May 28, 2019 | Never finaled issued May 2019, no final | 601 04th St | unit # 108: renovation of kitchen and bathroom.Details
unit # 108: renovation of kitchen and bathroom. | $15,000 |
| May 3, 2019 | Completed final sign-off Feb 2022 | 288 Union St | unti 1: kitchen and bathroom remodel. kitchen: 128 sqft. bathroom: 84 sqft. kitchen: demo amd replace all cabinets. replace electrical range to gas. add (4) outlets. replace sink and faucet. bathroom: demolish bathtub and replace with shower only. new shower pan.Details
unti 1: kitchen and bathroom remodel. kitchen: 128 sqft. bathroom: 84 sqft. kitchen: demo amd replace all cabinets. replace electrical range to gas. add (4) outlets. replace sink and faucet. bathroom: demolish bathtub and replace with shower only. new shower pan. | $15,000 |
| Aug 13, 2018 | Completed final sign-off Feb 2022 | 288 Union St | remove and replace kitchen cabinets in apartment 2 and 3; (10'x12'each)remove and replace bathroom tile in apartment 2 and 3. (total of two bathroom 5'x8') interior and exterior repainting. no other interior or exterior work per this permit.Details
remove and replace kitchen cabinets in apartment 2 and 3; (10'x12'each)remove and replace bathroom tile in apartment 2 and 3. (total of two bathroom 5'x8') interior and exterior repainting. no other interior or exterior work per this permit. | $18,000 |
| Oct 18, 2017 | Completed final sign-off Nov 2024 | 241 Monterey Bl | add laundry, deck and stair as 2nd means of egress for 2nd unit. remodel entry area for both units. remodel kitchen, deck and stairs at main unit. remodel lower fl of lower unit, add bath, study, family roomDetails
add laundry, deck and stair as 2nd means of egress for 2nd unit. remodel entry area for both units. remodel kitchen, deck and stairs at main unit. remodel lower fl of lower unit, add bath, study, family room | $85,000 |