Back to bathroom remodel contractors
Jason Brown Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Jun 2016
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 328 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2016 | Completed final sign-off Mar 2017 | 3629 Taraval St | convert retail space to ltd restaurant use. remodel of (e) 538 sq ft. commercial interior. upgrade & relocate existing bathroom, cabinets & services for cafe. change of use.Details
convert retail space to ltd restaurant use. remodel of (e) 538 sq ft. commercial interior. upgrade & relocate existing bathroom, cabinets & services for cafe. change of use. | $50,000 |
| Jan 5, 2016 | Completed final sign-off May 2016 | 20 Belvedere St | bathroom remodel (split bath).Details
bathroom remodel (split bath). | $40,000 |
| Jul 29, 2015 | Completed final sign-off Sep 2016 | 1836 48th Av | bath & kitchen remodel, insulate & new sheetrock throughout, remove fireplace, upgrade electrical to code for apartment.Details
bath & kitchen remodel, insulate & new sheetrock throughout, remove fireplace, upgrade electrical to code for apartment. | $50,000 |
| Jun 23, 2015 | Completed final sign-off May 2016 | 1445 14th Av | remove tile (floor/walls) in bath. install new tile, plumbing & upgrade electrical to meet current codes. no structural work.Details
remove tile (floor/walls) in bath. install new tile, plumbing & upgrade electrical to meet current codes. no structural work. | $13,000 |
| Jul 16, 2014 | Completed final sign-off Jul 2015 | 1255 37th Av | reconfigure (e) laundry + bathroom, current access to rear yard is through toilet room. work consists of adding interior partition to separate bath, addition of new exterior french door + reconfigure of stair + deck to yard.Details
reconfigure (e) laundry + bathroom, current access to rear yard is through toilet room. work consists of adding interior partition to separate bath, addition of new exterior french door + reconfigure of stair + deck to yard. | $35,000 |