Permit GraphShortlistSan Francisco building permits since 2000

James Wimmer

Contractor license
747021
State license record
Based in
Martinez
On San Francisco permits
Dec 2019 to May 2026
Last 24 months
1 permit filed

3 permits since 2000: 1 completed, 1 in progress, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllKitchen remodel 1Bathroom remodel 2

2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 174 days from filing to permit and 309 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jan 15, 2021Never finaled
issued Feb 2021, no final
758 26th Avrev to pa201912240442: replace (e) substandard (unreinforced, shallow deptch & cracked) concrete footings and conc. pedestals with (n) continuous foots. repair floor & walls in (e) bathroom damaged by dry rot.
Details
Permit
202101152799
Status
issued
Filed
Jan 15, 2021
Permit issued
Feb 9, 2021
Declared cost
$10,000
Address
758 26th Av

rev to pa201912240442: replace (e) substandard (unreinforced, shallow deptch & cracked) concrete footings and conc. pedestals with (n) continuous foots. repair floor & walls in (e) bathroom damaged by dry rot.

Open the permit page

$10,000
Dec 24, 2019Completed
final sign-off Sep 2021
758 26th Avconvert portion of exiting basement and room into family room and bath. all work is within existing building envelope (i.e. no vertical or horizontal extension)
Details
Permit
201912240442
Status
complete
Filed
Dec 24, 2019
Permit issued
Nov 12, 2020
Final sign-off
Sep 17, 2021
Declared cost
$40,000
Address
758 26th Av

convert portion of exiting basement and room into family room and bath. all work is within existing building envelope (i.e. no vertical or horizontal extension)

Open the permit page

$40,000