Back to bathroom remodel contractors
James Pope Fine Cabinetry
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2008
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 50 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2003 | Completed final sign-off Oct 2003 | 814 Stanyan St | bath remodel 2nd floor.Details
bath remodel 2nd floor. | $20,000 |
| Jun 9, 2003 | Completed final sign-off Jul 2003 | 569 Minna St | perform work as per markoff structural pest control co. dry rot repair, add bathroom on 1st floor/3rDetails
perform work as per markoff structural pest control co. dry rot repair, add bathroom on 1st floor/3r | $30,000 |
| Feb 29, 2000 | Completed final sign-off Mar 2002 | 3730 26th St | replace (e) fire place, reconfigure bathroom & kitchen,rev to #9926308Details
replace (e) fire place, reconfigure bathroom & kitchen,rev to #9926308 |