Back to bathroom remodel contractors
James O'neill Construction
- Based in
- Pacifica
- On San Francisco permits
- Oct 2009 to Jun 2025
- Last 24 months
- 2 permits filed
32 permits since 2000: 29 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 62 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2025 | Completed final sign-off Feb 2026 | 711 10th Av | 2nd floor remodel 1 & 1/2 baths. fixtures to remain in (e) locations.Details
2nd floor remodel 1 & 1/2 baths. fixtures to remain in (e) locations. | $18,000 |
| Jul 28, 2023 | Completed final sign-off Sep 2023 | 586 16th Av | remove fixtures and plaster and install new fixtures in same locations. repair drywall. scope of work at upstairs bathroom only.Details
remove fixtures and plaster and install new fixtures in same locations. repair drywall. scope of work at upstairs bathroom only. | $15,000 |
| Apr 4, 2022 | Completed final sign-off Apr 2022 | 645 Haight St | unit 3a: remodel (e) kitchen & bathroom. new appliances, cabinets, lights and tilet/shower. remove partition wall adjacent to kitchen cabinets.Details
unit 3a: remodel (e) kitchen & bathroom. new appliances, cabinets, lights and tilet/shower. remove partition wall adjacent to kitchen cabinets. | $30,000 |
| Dec 2, 2015 | Completed final sign-off Feb 2016 | 645 Haight St | add a new 1/2 bath & closet on mezzanine level. new walls to define space. n/a for maher.Details
add a new 1/2 bath & closet on mezzanine level. new walls to define space. n/a for maher. | $12,600 |
| Dec 4, 2013 | Completed final sign-off Jan 2014 | 511 Fell St | to comply with nov# 201317671 & 201316021, replace kitchen vaninets & new sheetrock, replace bathroom fixtures & new sheetrock, repair dryrot on back stairs (less than 50% )Details
to comply with nov# 201317671 & 201316021, replace kitchen vaninets & new sheetrock, replace bathroom fixtures & new sheetrock, repair dryrot on back stairs (less than 50% ) | $15,000 |
| Aug 13, 2013 | Never finaled issued Aug 2013, no final | 511 Fell St | unit #1. remove & replace kitchen cabinets & flooring. remove & replace bath fixtures & floors. patch & paint unit.Details
unit #1. remove & replace kitchen cabinets & flooring. remove & replace bath fixtures & floors. patch & paint unit. | $5,000 |
| Aug 20, 2012 | Completed final sign-off Nov 2012 | 2570 29th Av | new full bathroom at garage level, replace fixtures at bathroom at main level (2nd floor).Details
new full bathroom at garage level, replace fixtures at bathroom at main level (2nd floor). | $9,000 |