James & James Construction Corp
- Based in
- Prescott
- On San Francisco permits
- Oct 2014 to Sep 2020
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 141 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2020 | Never finaled issued Jan 2021, no final | 590 Bush St | remodel 88 (e) rooms (108 baths): removing 1 piece shower, repl shower valves, install new shower pan, install densshield (or equiv) at shower walls, install new tile around shower walls, r/r tile on bath floors, r/r toilet, r/r vanity light fixtures. all work in-kind.Details
remodel 88 (e) rooms (108 baths): removing 1 piece shower, repl shower valves, install new shower pan, install densshield (or equiv) at shower walls, install new tile around shower walls, r/r tile on bath floors, r/r toilet, r/r vanity light fixtures. all work in-kind. | $108,000 |