Back to bathroom remodel contractors
James Barton
- Based in
- Hayward
- On San Francisco permits
- Jul 2009 to Jul 2009
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 308 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2009 | Never finaled issued Jun 2010, no final | 225 Crescent Av | to comply with nov 200448082. alter(e) attic into habitable space consist (n) bedrm, 2 full baths, stairs. alteration on main fl: relocating laundry, bath, fam.rm in rear. living & dining rm alteration. reconfiguration of roof in rear portion. reconstruct of rear portion of bldg/porchDetails
to comply with nov 200448082. alter(e) attic into habitable space consist (n) bedrm, 2 full baths, stairs. alteration on main fl: relocating laundry, bath, fam.rm in rear. living & dining rm alteration. reconfiguration of roof in rear portion. reconstruct of rear portion of bldg/porch | $23,000 |