Jacobs Remodel
- Based in
- Los Gatos
- On San Francisco permits
- Jun 2021 to Aug 2021
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2021 | Completed final sign-off Mar 2022 | 751 Commercial St | white vynil window (double hung) installation in the existing opening. the opening deminsions are 72 in. height by 26 in width. the proposed new opening is 50" x 26" the frame work will be performed to make the opening smaller. the window is facing the back of home. u-factor <0.30Details
white vynil window (double hung) installation in the existing opening. the opening deminsions are 72 in. height by 26 in width. the proposed new opening is 50" x 26" the frame work will be performed to make the opening smaller. the window is facing the back of home. u-factor <0.30 | $3,000 |
| Jul 30, 2021 | Completed final sign-off Apr 2022 | 751 Commercial St | two bathroom remodel, 1 toilet, smoke detectors installation, 1 kitchen remodel.Details
two bathroom remodel, 1 toilet, smoke detectors installation, 1 kitchen remodel. | $40,000 |
| Jun 10, 2021 | Completed final sign-off Jan 2022 | 5407 Diamond Heights Bl | apt 3 interior remodel: kitchen and bathroom remodel. new wet bar at 1st fl. no bearing partition changes. lighting upgrade.Details
apt 3 interior remodel: kitchen and bathroom remodel. new wet bar at 1st fl. no bearing partition changes. lighting upgrade. | $30,000 |