Jackson Pacific Builders
- Based in
- Pacifica
- On San Francisco permits
- Apr 2003 to Sep 2011
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 1 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 26, 2011 | Completed final sign-off Jan 2012 | 367 Collingwood St | kitchen remodel and bath remodel. demo existing exterior deck and remove existing exterior door from kitchen to deck. window replacement at kitchen, breakfast, new kitchen and bath fixtures and finishes.Details
kitchen remodel and bath remodel. demo existing exterior deck and remove existing exterior door from kitchen to deck. window replacement at kitchen, breakfast, new kitchen and bath fixtures and finishes. | $50,000 |