Back to bathroom remodel contractors
Jack C Salvato /Dba A Green Home
- Based in
- San Mateo
- On San Francisco permits
- May 2010 to Mar 2014
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 2 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2014 | Completed final sign-off Oct 2014 | 219 Brannan St | remodel guest bath in kind - no walls, doors, windows under this scope. no structural workDetails
remodel guest bath in kind - no walls, doors, windows under this scope. no structural work | $10,000 |
| Nov 4, 2013 | Completed final sign-off Oct 2014 | 219 Brannan St | kitchen and bath remodel in kind, new floors, cab, throughout unit.Details
kitchen and bath remodel in kind, new floors, cab, throughout unit. | $90,000 |
| Jun 3, 2013 | Completed final sign-off Oct 2013 | 2450 Octavia St | unit 3c- fire damage; replace sheetrocks; remodel kitchen and bathroom; replace 1 window not facing street.Details
unit 3c- fire damage; replace sheetrocks; remodel kitchen and bathroom; replace 1 window not facing street. | $25,600 |
| Jul 26, 2012 | Completed final sign-off Feb 2013 | 12 Knollview Wy | convert (751 s.f) at garage level (first floor) into habitable space for bedroom, bathroom, storage room & laundry. install 3 new windows in new openings, 1 new window & door in existing openings, & associated voluntary structural improvement.Details
convert (751 s.f) at garage level (first floor) into habitable space for bedroom, bathroom, storage room & laundry. install 3 new windows in new openings, 1 new window & door in existing openings, & associated voluntary structural improvement. | $47,500 |