Back to bathroom remodel contractors
Ja Constructoin
- Based in
- San Francisco
- On San Francisco permits
- May 2019 to Aug 2026
- Last 24 months
- 5 permits filed
10 permits since 2000: 5 completed, 4 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 11 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 18, 2020 | Completed final sign-off Dec 2020 | 25 Vista Verde Ct | remodel of bathrooms (2 1/2) and kitchen. add 2nd sink in master & hall bathrooms. add 2nd shower head in master shower. replace 2'10" doorway with 8'0" opening with 4"x12" header.Details
remodel of bathrooms (2 1/2) and kitchen. add 2nd sink in master & hall bathrooms. add 2nd shower head in master shower. replace 2'10" doorway with 8'0" opening with 4"x12" header. | $25,000 |
| May 21, 2019 | Completed final sign-off Aug 2019 | 2591 22nd Av | apt #301: replace kitchen cabinets, counters, appliances, lights. replace bathroom cabinets(2), counters, sinks, lights. paint and replace flooringDetails
apt #301: replace kitchen cabinets, counters, appliances, lights. replace bathroom cabinets(2), counters, sinks, lights. paint and replace flooring | $15,000 |