J.W.D. Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Mar 2025
- Last 24 months
- 3 permits filed
176 permits since 2000: 127 completed, 4 in progress, 28 never finaled, 17 expired or cancelled.
Of the 28 never-finaled permits, 3 are 5 to 10 years old, 25 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 1 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 66 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 20, 2015 | Expired or cancelled withdrawn Dec 2015 | 2312 Castro St | fix fire damage from the neighbor, changing living area & kitchen location, relocate internal staircase, strengthen (e) walls and frames for future 3/f addition, changing front & back windows & door location, add 8' height deck in the back.Details
fix fire damage from the neighbor, changing living area & kitchen location, relocate internal staircase, strengthen (e) walls and frames for future 3/f addition, changing front & back windows & door location, add 8' height deck in the back. | $150,000 |
| Oct 16, 2014 | Never finaled issued Jun 2015, no final | 1475 Haight St | add new 2-story deck with new stair case at 2nd & 3rd floor in back of the existing house.Details
add new 2-story deck with new stair case at 2nd & 3rd floor in back of the existing house. | $18,000 |
| Jul 21, 2003 | Never finaled issued Jul 2003, no final | 809 Page St | dry rot repair for extg deck and stairs of the rear bldgDetails
dry rot repair for extg deck and stairs of the rear bldg | $3,000 |
| Mar 13, 2003 | Expired or cancelled expired Jun 2011 | 3302 California St | repair rear dryrot stairs & deck less than 50 percent -repair in kindDetails
repair rear dryrot stairs & deck less than 50 percent -repair in kind | $1,700 |
| Jan 9, 2001 | Completed final sign-off Mar 2001 | 2049 09th Av | dry rot repair rear deck side stair front stucco as dry rot report. change the front exisiting stuccDetails
dry rot repair rear deck side stair front stucco as dry rot report. change the front exisiting stucc | $800 |