Back to bathroom remodel contractors
J R Williams Company Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Mar 2014
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2014 | Completed final sign-off Sep 2014 | 561 Greenwich St | #7: replace w/new bath tub, vanity, sinks, and toilets. replace w/new (11) lateral feet kitchen cabinets w/new counter top and new sink. (2) bathrooms & (1) kitchen.Details
#7: replace w/new bath tub, vanity, sinks, and toilets. replace w/new (11) lateral feet kitchen cabinets w/new counter top and new sink. (2) bathrooms & (1) kitchen. | $30,000 |
| Sep 17, 2013 | Completed final sign-off Mar 2014 | 33 Glover St | remodel kitchen & laundry consisting of removing a portion of bering wall, by adding a beam. remodel kithcne & bath including new cabinets, tops, plumbing fixtures & appliances. high efficacy lighting @ kitchen & bath.Details
remodel kitchen & laundry consisting of removing a portion of bering wall, by adding a beam. remodel kithcne & bath including new cabinets, tops, plumbing fixtures & appliances. high efficacy lighting @ kitchen & bath. | $15,000 |
| Feb 27, 2013 | Completed final sign-off Jun 2013 | 896 Union St | replace with new: bathtub, vanity sink, temper glass window by tub. replace with new: 5 lineal feet kitchen cabinet with cuontertop & new sink. lighting shall comply withtitle 24 in baht & kitchen cec 150. no existing or new bath fan or kitchen oven hoodDetails
replace with new: bathtub, vanity sink, temper glass window by tub. replace with new: 5 lineal feet kitchen cabinet with cuontertop & new sink. lighting shall comply withtitle 24 in baht & kitchen cec 150. no existing or new bath fan or kitchen oven hood | $19,500 |
| Oct 10, 2012 | Completed final sign-off Nov 2012 | 3201 Pierce St | install new bathtub, toilet, vanity, sink, new flooring including tempered glass window above tub, repair 2 interior doors, install new counter top/cabinet in kitchen (2'x6' long counter), lighting shall comply w/title 24 in bathroom & kitchen. install sheetrock soffitt in hallway, paint interior.Details
install new bathtub, toilet, vanity, sink, new flooring including tempered glass window above tub, repair 2 interior doors, install new counter top/cabinet in kitchen (2'x6' long counter), lighting shall comply w/title 24 in bathroom & kitchen. install sheetrock soffitt in hallway, paint interior. | $16,400 |