J R S General Construction Contractor
- Based in
- Half Moon Bay
- On San Francisco permits
- Nov 2010 to Jan 2025
- Last 24 months
- 1 permit filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2025 | Completed final sign-off Jul 2025 | 810 24th Av | 3 wood columns dry rot repair, concrete stem or precast block replacement.Details
3 wood columns dry rot repair, concrete stem or precast block replacement. | $3,600 |
| Nov 5, 2010 | Expired or cancelled cancelled Dec 2010 | 125 20th Av | replace (e) sewer clay pipe from (no structural alteraton under structure to city p-trap about 50' total, redo driveway and sidewalks partial concrete.Details
replace (e) sewer clay pipe from (no structural alteraton under structure to city p-trap about 50' total, redo driveway and sidewalks partial concrete. | $8,000 |