Back to bathroom remodel contractors
J P M Construction
- Based in
- San Mateo
- On San Francisco permits
- Feb 2011 to Nov 2013
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 26 days from filing to permit and 149 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 26, 2013 | Completed final sign-off May 2014 | 101 Lombard St | unit 304e: remove and replace bathroom and kitchen. remodel (remove and replace) of living room and bedroom; (fire sprinkler and/or fire alarm is required under separate permitDetails
unit 304e: remove and replace bathroom and kitchen. remodel (remove and replace) of living room and bedroom; (fire sprinkler and/or fire alarm is required under separate permit | $75,000 |
| Apr 19, 2013 | Completed final sign-off Aug 2013 | 2200 Pacific Av | replace in kind kitchen, master bathroom, guest bathroom. no walls alteration, replace fixtures & finishes only. 50% of kitchen lighting to be high efficacy, bathroom lighting to be high efficacy or provide occupancy sensor. new kitchen hood & bath fans to connect to existing duct.Details
replace in kind kitchen, master bathroom, guest bathroom. no walls alteration, replace fixtures & finishes only. 50% of kitchen lighting to be high efficacy, bathroom lighting to be high efficacy or provide occupancy sensor. new kitchen hood & bath fans to connect to existing duct. | $40,000 |
| Jul 30, 2012 | Completed final sign-off Feb 2013 | 2349 Vallejo St | removal of walls,interior at living, dining, closet. remodel master bath and closet,replace m.bed extg.door due to dryrot, replace m. bath wd wdw with fiberglass, refinish flooring, replace hot water heater with tankless. replace wd burning fire place with gas insertsDetails
removal of walls,interior at living, dining, closet. remodel master bath and closet,replace m.bed extg.door due to dryrot, replace m. bath wd wdw with fiberglass, refinish flooring, replace hot water heater with tankless. replace wd burning fire place with gas inserts | $50,000 |
| Feb 9, 2011 | Completed final sign-off Oct 2011 | 2134 Green St | construct stair from street level unit#2 to lower level. improve under level unit to accomodate bedroom, bath and laundry. sprinklers required for new work, to be submitted under separate permit.Details
construct stair from street level unit#2 to lower level. improve under level unit to accomodate bedroom, bath and laundry. sprinklers required for new work, to be submitted under separate permit. | $63,000 |