Back to bathroom remodel contractors
J M Woods Construction
- Based in
- Kendfield
- On San Francisco permits
- Aug 2007 to Sep 2013
- Last 24 months
- 0 permits filed
11 permits since 2000: 7 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 6 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2013 | Completed final sign-off Dec 2013 | 1979 30th Av | bathroom:demo entire bathroom, upgrade plmg & electrical. add new insulation and drywall. legalize garage bedroom & bathroom. demo entire drywall on interior walls. add new closet space. relocate window at bathroom. install sliding door of bedroom window location. upgrade elec,plmg, & heating.Details
bathroom:demo entire bathroom, upgrade plmg & electrical. add new insulation and drywall. legalize garage bedroom & bathroom. demo entire drywall on interior walls. add new closet space. relocate window at bathroom. install sliding door of bedroom window location. upgrade elec,plmg, & heating. | $45,000 |
| Mar 21, 2008 | Completed final sign-off Aug 2008 | 1975 30th Av | remove and replace kitchen with new cabinets and fixtures. remove a non-structural wall at opening to dining room. renew electric & plumbing. replace 2 windows with new same size&location. completely demo bathroom and replace with new. add new service from 40 amp to 130. title 24.Details
remove and replace kitchen with new cabinets and fixtures. remove a non-structural wall at opening to dining room. renew electric & plumbing. replace 2 windows with new same size&location. completely demo bathroom and replace with new. add new service from 40 amp to 130. title 24. | $25,000 |