J L L Builders
- Based in
- Novato
- On San Francisco permits
- Nov 2002 to Jul 2019
- Last 24 months
- 0 permits filed
12 permits since 2000: 9 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 86 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2018 | Completed final sign-off Aug 2019 | 1745 Clement St | revision to 201805239964 to expand scope on 3 levels. basmt: 2 art studios, 2 gallerys, 1/2 bath, wetbar. 1st fl repair/reframe walls, liv rm w/wetbar, remodel bath, 3rd fl: kitchen remodel, 2 baths, repair/reframe walls, replace rear deckDetails
revision to 201805239964 to expand scope on 3 levels. basmt: 2 art studios, 2 gallerys, 1/2 bath, wetbar. 1st fl repair/reframe walls, liv rm w/wetbar, remodel bath, 3rd fl: kitchen remodel, 2 baths, repair/reframe walls, replace rear deck | $40,000 |
| Dec 2, 2008 | Completed final sign-off Oct 2009 | 1914 Greenwich St | demo (e) lightwell walls @ 2/f rear only, frame flr & roof @old lightwell location @ 2/f. relocate some 4" cast waste/vent pipes, add receptacle & lights to new addition space. add 4'x8' skylight into new roof over new space. remove/rebuild 3/f rear deck. add new french door to new addition,Details
demo (e) lightwell walls @ 2/f rear only, frame flr & roof @old lightwell location @ 2/f. relocate some 4" cast waste/vent pipes, add receptacle & lights to new addition space. add 4'x8' skylight into new roof over new space. remove/rebuild 3/f rear deck. add new french door to new addition, | $48,750 |