Back to bathroom remodel contractors
J L Construction
- Based in
- Albany
- On San Francisco permits
- Jan 2017 to Apr 2017
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 127 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2017 | Never finaled issued Aug 2017, no final | 580 Bush St | interior remodel of existing commercial space. change of use from salon to restaurant use. new commercial kitchen and accessible baths. new 2 hr rated type 1 exhaust shaft with cleanouts and rooftop mech equip. remodel res units under sep permitDetails
interior remodel of existing commercial space. change of use from salon to restaurant use. new commercial kitchen and accessible baths. new 2 hr rated type 1 exhaust shaft with cleanouts and rooftop mech equip. remodel res units under sep permit | $145,000 |