Back to bathroom remodel contractors
J K Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Feb 2024
- Last 24 months
- 0 permits filed
45 permits since 2000: 36 completed, 1 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 11 completed, 3 never finaled. Typically 4 days from filing to permit and 213 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2019 | Completed final sign-off Oct 2019 | 1331 Columbus Av | power door operatior per prd 51-16 remodel (e) add bathroom at 2nd flr repair - dry rot at mezzanine/roof levelDetails
power door operatior per prd 51-16 remodel (e) add bathroom at 2nd flr repair - dry rot at mezzanine/roof level | $30,000 |
| Jan 24, 2019 | Completed final sign-off Apr 2021 | 477 Belvedere St | mep work at 3rd flr. 8'-0" rear horizontal additon of 155 sq ft to (e) 3rd flr. (3) new windows & (3) new skylights. interior partition changes & renovations to (e) 3 bedrooms, 3 closets, 2 full baths & 1 study. w/ sprinklersDetails
mep work at 3rd flr. 8'-0" rear horizontal additon of 155 sq ft to (e) 3rd flr. (3) new windows & (3) new skylights. interior partition changes & renovations to (e) 3 bedrooms, 3 closets, 2 full baths & 1 study. w/ sprinklers | $208,000 |
| Jan 7, 2019 | Completed final sign-off Dec 2019 | 2527 42nd Av | infill (e) lightwell (not visible from street), new rear yard deck. convert rear portion of garage into family, bed rm, bath rm, media rm, remodel kitchen and upstairs bathrooms.Details
infill (e) lightwell (not visible from street), new rear yard deck. convert rear portion of garage into family, bed rm, bath rm, media rm, remodel kitchen and upstairs bathrooms. | $190,000 |
| Nov 14, 2017 | Completed final sign-off Apr 2021 | 477 Belvedere St | remove 2nd fl rear decks, exterior stairs, dinoing bay window of kitchen, const 2 story rear addition w/ 1 story roof deck off 2nd fl & stairs to yard, adding guest bed, bath, 2 media rm at 1st fl, 3rd fl, roof over one-story light court enclose for office use, new fixt, finishes, seismic upgrade.Details
remove 2nd fl rear decks, exterior stairs, dinoing bay window of kitchen, const 2 story rear addition w/ 1 story roof deck off 2nd fl & stairs to yard, adding guest bed, bath, 2 media rm at 1st fl, 3rd fl, roof over one-story light court enclose for office use, new fixt, finishes, seismic upgrade. | $575,000 |
| Feb 25, 2013 | Completed final sign-off Sep 2013 | 1917 08th Av | legalize bedroom and study. construct (two) full bathroom. wet bar. replace interior stair. replace & underpin partial (e) foundation at ground fl. remodel (e) kitchen, bathrooms. construct one (n) bathroom. (n) four skylights & rewire elect/lighting at 2nd fl at rear of bldg.Details
legalize bedroom and study. construct (two) full bathroom. wet bar. replace interior stair. replace & underpin partial (e) foundation at ground fl. remodel (e) kitchen, bathrooms. construct one (n) bathroom. (n) four skylights & rewire elect/lighting at 2nd fl at rear of bldg. | $65,000 |
| Jul 20, 2012 | Completed final sign-off Apr 2014 | 1366 07th Av | revision to appl #2011.0919.4918 - construct storage room & furnace room at ground floor. revised & rearrange kitchen, bathrooms location for 2nd & 3rd floor.Details
revision to appl #2011.0919.4918 - construct storage room & furnace room at ground floor. revised & rearrange kitchen, bathrooms location for 2nd & 3rd floor. | $15,000 |
| Oct 24, 2011 | Completed final sign-off May 2012 | 1687 Alabama St | comply w/complaint #200123328 & 200341852-construct one bedrm, one bath & stair to 2nd flr. all work at ground flr. relocate (e) bath, kitchen, remove partition wall,replace (e) dryrot w/new, upgrade ceiling joists @ 2nd flr. rewire electrical @ 2/f. constr two skylights, repair (e) front staircase.Details
comply w/complaint #200123328 & 200341852-construct one bedrm, one bath & stair to 2nd flr. all work at ground flr. relocate (e) bath, kitchen, remove partition wall,replace (e) dryrot w/new, upgrade ceiling joists @ 2nd flr. rewire electrical @ 2/f. constr two skylights, repair (e) front staircase. | $82,000 |
| Aug 23, 2010 | Completed final sign-off Nov 2010 | 1746 41st Av | legalize (e) family rm, bedroom & bathroom at ground floor. remodel (e) kitchen, bathroom & re-wire elect lighting at second floor.Details
legalize (e) family rm, bedroom & bathroom at ground floor. remodel (e) kitchen, bathroom & re-wire elect lighting at second floor. | $43,000 |
| Feb 19, 2009 | Completed final sign-off Sep 2009 | 1125 Leavenworth St | #1127- remodel existing kitchen & bathroom. add 1 bathroom, relocate select non-bearing partitions. replace water heater & furnace. install recess lighting. refinish hardwood floor. scope of work inside unit 1127.Details
#1127- remodel existing kitchen & bathroom. add 1 bathroom, relocate select non-bearing partitions. replace water heater & furnace. install recess lighting. refinish hardwood floor. scope of work inside unit 1127. | $116,000 |
| May 19, 2008 | Completed final sign-off Sep 2009 | 47 Mirabel Av | 2 story rear yard addition to include: new family room, bedroom, bathroom, and rear yard deck at 2nd floor, new rec room, storage, and bath at 1st floor.Details
2 story rear yard addition to include: new family room, bedroom, bathroom, and rear yard deck at 2nd floor, new rec room, storage, and bath at 1st floor. | $200,000 |
| Sep 11, 2007 | Never finaled issued Feb 2011, no final | 609 26th Av | new remodel of single family dwelling with basement & garage. horiz/vert addition, add bath & entertainment room @ ground floor. new garage door opening. 2nd floor: add 3 bedrooms & study, 3 bathrooms. new stairs. ground floor to be 2nd unit.Details
new remodel of single family dwelling with basement & garage. horiz/vert addition, add bath & entertainment room @ ground floor. new garage door opening. 2nd floor: add 3 bedrooms & study, 3 bathrooms. new stairs. ground floor to be 2nd unit. | $120,000 |
| Mar 12, 2007 | Never finaled issued Mar 2007, no final | 1842 18th Av | remove existing footings. excavate/refinish new foundation & new retaining wall. convert basement to living space. remodel kitchen & bathroom.Details
remove existing footings. excavate/refinish new foundation & new retaining wall. convert basement to living space. remodel kitchen & bathroom. | $85,000 |
| Jan 9, 2006 | Never finaled issued Jan 2006, no final | 96 Mirabel Av | revision 2 to appl#200502145465-add wall to divide bedroom into 2 rooms (family & bed).relocate gas only zero clearance fireplace.change size/type of windows @side of structure.cosmetic changes to bathrooms.Details
revision 2 to appl#200502145465-add wall to divide bedroom into 2 rooms (family & bed).relocate gas only zero clearance fireplace.change size/type of windows @side of structure.cosmetic changes to bathrooms. | $100 |
| Sep 27, 2000 | Completed final sign-off Jan 2001 | 1240 Fillmore St | remodeling women & man bathroom, all new plumbing fixture mew electricfixture. new tile wall & ploorDetails
remodeling women & man bathroom, all new plumbing fixture mew electricfixture. new tile wall & ploor | $42,000 |